-
Published30/07/2024
-
Deadline29/08/2024
-
Canceled10/09/2024
-
Today12/10/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Execution of project and costing documentation for the task: “Improving the energy efficiency of public infrastructure buildings located in Wałbrzych and subject to conservation supervision, through their thermomodernization”, divided into 6 parts. (II)
1. The subject of the contract is the preparation of design and costing documentation and obtaining a decision on the construction permit or a certificate confirming that there are no grounds for objecting to the notification of construction or performance of other construction works, adapting all technical solutions to the applicable regulations and performing author's supervision for the investment task entitled: ‘Improving the energy efficiency of eight public infrastructure buildings located in Wałbrzych and subject to conservation supervision, through their thermal modernisation’, in the field of: Task 1 - the building of the I High School with Bilingual Branches located at ul. I. Paderewskiego 17 in Wałbrzych, Task 2 - the building of the Second High School located at Aleja Wyzwolenia 34 in Wałbrzych, Task 3 - the building located at ul. J. Matejki 2 in Wałbrzych, Task 4 - a building located at ul. J. Matejki 3 in Wałbrzych, Task 5 - the Town Hall building located at ul. Magistracki Square 1 in Wałbrzych, Task 6 - a building located at ul. J. Słowackiego 23a in Wałbrzych. As part of the subject of the contract, for each task, complete design and costing documentation was provided on the basis of the currently applicable regulations and guidelines of the Ordering Party on the basis of the following documents held by the Ordering Party: building inventories and energy audits (the Contracting Authority will make the inventories available). The contract will be implemented as part of a project applying for funding from the European Union under the Just Transition Fund, Priority FEDS.09 European Funds for the transformation of mining areas in Lower Silesia, measure FEDS.09.06 Environmental transformation - ITI, type of project: 9.6.B Renovation to increase the energy efficiency of public infrastructure buildings. The Contractor is obliged to prepare design and costing documentation in accordance with the Regulations for the selection of projects.
https://gminawalbrzych.logintrade.net/zapytania_email,171922,475053b7c1d39a14c278e3ba016b6f4a.html
https://gminawalbrzych.logintrade.net/zapytania_email,171922,475053b7c1d39a14c278e3ba016b6f4a.html
71320000 - Engineering design services
45330000 - Plumbing and sanitary works
45331000 - Heating, ventilation and air-conditioning installation work
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.