Technology park of the town of Šumperk with the involvement of microgrids Text automatically translated in your browsing language Automatically translated
The Šumperk Technology Park project, involving microgrids as part of the city's broader energy strategy, includes elements of a technology park with microgrid consumption management. The subject of the contract is a complex implementation of the project Technology Park of the town of Šumperk with involvement in the form of microgrids and includes: Renovation of the roof of the kindergarten Šumavská 1916/15, 787 01 Šumperk as part of the preparation for the installation of the PV plant Construction of utility networks and modernization of the wiring for connecting the buildings of the elementary school Šumavská 2325/21 and the kindergarten Šumavská 1916/15, 787 01 Šumperk including distribution systems for public lighting (VO) with switchboards and car chargers Construction of the PV plant on three buildings: ZŠ Šumavská 2325/21, 787 01 Šumperk MŠ Šumavská 1916/15, 787 01 Šumperk ZŠ Slunce 2692/38, 787 01 Šumperk Construction of a new supply point and microgrid with main switchboard and large-capacity battery storage (BESS) Integration and commissioning of energy management including control software, measuring and control elements in connection with all elements of the microgrid Partial performance of the contract is not allowed. The implementation must not endanger the operation of school facilities. Any planned limitation of the operation of electricity must be coordinated with the Contracting Authority and planned with regard to the operation of the nursery and school, ideally during holidays or other operating breaks. The project is primarily intended for implementation with the support of the ModF – RES+ No 4/2024 – ModF-RES3-FV_4 subsidy programme entitled ‘Sumperk City Power Plant’, but its implementation is not dependent on the subsidy. The expected and installed capacity of the power plants is at least 196.2 kWp in total, the battery storage capacity is at least 668.92 kWh in total with a 5% tolerance. The contract also includes the provision of regular servicing and maintenance during the sustainability period of the project in accordance with the terms of the subsidy programme, which is 5 years from the submission of the documents on the completion of the project implementation to the Final Evaluation of the Action (hereinafter referred to as the “ZVA”). The implementation also includes the connection of the completed work, including commissioning and subsequent installation of energy management in the form of hardware, including control software and measuring and control elements for optimising energy production and consumption at the installation sites, according to the parameters listed in Annex 06_Contract for Work, which is part of the documentation. The components used must comply with the subsidy programme and have certificates that will be validated by accredited certification bodies (accredited body according to ŠCN EN ISO/IEC17065:2013 or a body recognised through IECEE, see the list at www.iecee.org/dyn/www/f?p=106:41:0.). The certificates will be handed over after the realization of the work. The subject of performance is further defined by the document folder in Annex 04_Background documents for implementation such as project documentation, contract with distributor and other relevant documents. The subject of performance of the contract will be realized completely within the scope of valid technical documentation and in accordance with the terms and conditions within the scope of concluded contracts, which are part of the ZD. The acceptance criterion for acceptance of the work is the one-off condition: all elements of the project are put into full operation, including the completed approval, all the prescribed revisions are carried out and the consent of the distribution company is obtained. The takeover is conditioned by a fully functional system including photovoltaic power plants, roof repair, connection and integration of BESS, full functionality of utilities and upgraded wiring as interconnected parts of the project. In addition, all documentation required for the granting of the Energy Regulatory Office licence is included in the takeover and energy management at the software level is activated. Part of the takeover is also training of plant operators and all related technological units for operation and maintenance of the system. Text automatically translated in your browsing language Automatically translated
https://zakazky.sumperk.cz/contract_display_1465.html
https://zakazky.sumperk.cz/contract_display_1465.html
71314000 - Energy and related services
09331200 - Solar photovoltaic modules
71350000 - Engineering-related scientific and technical services
45300000 - Building installation work
45310000 - Electrical installation work
71320000 - Engineering design services
51110000 - Installation services of electrical equipment
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.