-
Published10/08/2026
-
Deadline08/09/2026
-
Today09/09/2026
Utilities
- indicates text translated automatically in your browsing language
VgV Brandschutz - New building Wasserwerk Leutkirch i.A.
The large district town of Leutkirch in the Allgäu is planning the new construction of the waterworks consisting of administration, workshops and vehicle hall. The waterworks is currently located on the site of the Bauhof on Brühlstraße. Because the new construction of a fire station is planned at the current location and the construction yard is therefore being rebuilt elsewhere (south of the sewage treatment plant), a new location for the waterworks must also be found. For this purpose, a site survey was carried out. The Tautenhofer Straße site northeast of the existing pumping station on the Rauns prevailed in the municipal council, as the development (electricity, water) is already in place. Traffic connections/accessibility and operational synergies at this location are also high. According to the LRA's feedback on the preliminary construction request, the distance to the old protection zone II of the well must be maintained, so the new building must be moved away accordingly. The Rauns site also offers the opportunity to develop a blackout concept or network-connected emergency care for almost the entire municipal area from this location due to the central location in the supply network as well as the existing replacement supply well Rauns. The city of Leutkirch has already developed a spatial concept and a design, which will continue through the city up to and including LPH 4. A two-storey administration building with social facilities, workshops and warehouses is planned. Furthermore, a cold storage for pipes and a vehicle hall/garages are provided. Vehicles which are essential for operation or which have to stand free of frost due to their operational capability (e.g. tank trailers) should stand in the passage hall (hanger operation, shunting, loading). The remaining vehicles can be parked under the roof in the depot area. The GFA (R) is about 1,900m ², the GFA (S) about 335m ² for canopies. For the planning services for fire protection according to AHO issue 17, LPH 1-5 and 8 (without preparation of the award and participation in the award), optional special services of LPH 9 (escape and rescue plans), a specialist planner is also sought with experience in wood or wood hybrid construction. The assignment should be carried out in stages. There is no legal claim to the further commissioning of the subsequent performance level. For further information, please refer to 5.1. of the Notice and the attached summary information.
https://www.subreport.de/E37747285
https://www.subreport.de/E37747285
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.