Forster-Dorfner’s Hospital and Hospital Foundation – HLS
The Antonius kindergarten, built almost centrally in Hirschau, built in 1969, refurbished and expanded in 1996, will now be rebuilt after discussion and cost comparison in the city council. The kindergarten is owned by Forster-Dorfner’s Hospital and Hospital Foundation Hirschau, represented by the City of Hirschau, Rathausplatz 1, 92242 Hirschau. An architectural office is sought with procurement procedures (VgV). The kindergarten, ground floor, has so far an overbuilt area of about 550 m² and a converted room about 2,200 cbm. · A new 5- to 6-group kindergarten with 3 kindergarten groups and 2 to 3 groups will be planned for the crèche, possibly even larger. So far, the kindergarten had 4 groups, 2 x kindergarten, 2 x crib. The kindergarten has a pedagogical concept, which must be coordinated with the city council and the kindergarten management in the new building. Considerations should be made, among other things, in terms of energy, sustainability, building materials, building structures and practicality. The new building will be a replacement building on the existing 3.000 m² plot. The construction costs in the area so far amount to around EUR 3 million. The implementation is based on one year of planning and one year of construction for the award of the contract. Part of the kindergarten has already moved to a nearby container kindergarten. In case of demolition, the complete removal of the kindergarten into the container takes place as an interim solution. During the construction work, therefore, there is no need to consider the ongoing kindergarten operation. Due to the well-known structural problems with the existing existing building (untight roof with galvanised roof skin with internal gutters and drains), the partly marred building technology from the 1960s and the interior structure to be redesigned due to the room program, it was a result of the previous plans to rebuild the existing stock to the existing basement. In the course of the planning, it is necessary to examine whether the movement space cultivated in 1996 can be maintained, if necessary. The extension on the eastern side of 1996 has a basement floor. In the basement are the connections of electricity, telecoms, water, wastewater and also the district heating including the transfer station. The new building of the kindergarten is on the two cities. Plots of land No. 2027 and 2030, district Hirschau, limited. Wherein for the existing playground including the play equipment is to be considered as much as possible.
71320000 - Engineering design services
45200000 - Works for complete or part construction and civil engineering work
Type: quality
Description: Vorstellung des vorgesehenen Projektteams
Weight (percentage, exact): 1.3
Criterion:
Type: quality
Description: Darstellung der Arbeitsweise
Weight (percentage, exact): 1.2
Criterion:
Type: quality
Description: Darstellung der Methoden zur Überwachung und Einhaltung der Kosten und Termine sowie des Berichtswesens an den Auftraggeber
Weight (percentage, exact): 1.3
Criterion:
Type: quality
Description: Arbeitsweise der Bauleitung in LPH 8
Weight (percentage, exact): 1.4
Criterion:
Type: price
Description: Honorar
Weight (percentage, exact): 1.2
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.