-
Published23/09/2024
-
Deadline09/10/2024
-
Opening of tenders09/10/2024
-
Today18/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Rental Equipment BA01 Bank Dismantling NRM3 and Fuse Open Deck Text automatically translated in your browsing language Automatically translated
The Free State of Bavaria, represented by the Traunstein Water Management Office, Rosenheimerstr. 7, 83278 Traunstein requires appropriate personnel and equipment for the construction: • Section 1 of the measure for the dismantling of the shoreline protection (so-called ‘No-Regret 3’) between approx. Fkm 41,5 and 43,0 • the securing of the open deck in the area of Fkm 45,4 to 45,7 (production of support thresholds throughout the water) Measure No-Regret 3 was approved by decision of 09.09.2024 (see annex). For the construction work, the contents under point 2 must be observed and adhered to. The measures to secure the open deck were approved for the Austrian side by decision of 23 August 2024. For the construction work, the contents from point II. must be observed and adhered to. Objections or doubts about services and obligations must be raised before tenders are submitted. Subsequent objections based on ignorance of the location and the required scope of services cannot be taken into account! Shore dismantling (No-Regret 3) As part of the shore dismantling in construction section 1 (Fkm 41,5-43,0), the following services must be provided: + Extension of the stairway + Extension of the existing embankment of granite, sand-limestone and limestone incl. hydraulically bound bedding and jointing + Granite, sand-limestone and limestone transport to the open cover Fkm 45,4 – 45,7. Use there see below. + Breaking concrete and installation in concealed protection + removing the embankments and filling a berm in a width of about 10 m in the Salzach up to 0.50 m above the winter water level + storing the gravel of the embankment dismantling sideways for road rehabilitation + large-scale distribution of residual quantities of the embankment removal into the Salzach as a bed + if necessary (e.g. in times with higher water flow in the Salzach) clearing the embankment for BA 02 (Fkm 43.0-44.8) + Construction of 2 to 4 flat support thresholds (maximum approx. 1.5 m above base height, in the area of local columns up to approx. 2.0 m above base height) over the entire width of the water body (approx. 80 m). The ramping to undercurrent should be significantly flatter with about 5 % than the ramping to overcurrent with about 15 %. The support thresholds are given a slight trough in the transverse profile, approx. in the area of the existing valley path (see Annex 3). + general use of stone material from the shore dismantling No-Regret 3 + if necessary additional delivery and use of intermediate stones of the AG (Wasserwirtschaftsamt Traunstein) and its contractual partner (Landesregierung Salzburg) + integration of the support thresholds into the existing shore protection on the Bavarian shore + strengthening of the shore protection on the Bavarian shore in the area of the support thresholds (about 15-20 m upstream and downstream of the threshold crown) Text automatically translated in your browsing language Automatically translated
https://www.meinauftrag.rib.de
https://www.meinauftrag.rib.de
45520000 - Hire of earthmoving equipment with operator
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.