Published02/06/2025
-
Deadline27/06/2025
-
Today09/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
Works Contractor and as PSCS, HSE DML, HSE Pathfinder Decarbonisation Programme, Decarbonisation and Energy Upgrade of Regional Hospital Mullingar
The project involves service and fabric upgrades to the main hospital buildings at Regional Hospital, Mullingar, a new Energy Centre and associated infrastructure site works. Works will be carried out within a live hospital environment which must remain operational throughout. Works include replacement of existing flat roof finishes. Installation of roof level Photovoltaic arrays over new and existing roof finishes. Installation of edge protection systems. Installation of large plant and replacement of existing plant. Works within existing plantrooms and hospital building including installation of new cabling and electrical boards. Construction of a new energy centre including new heat pumps, ESB substation, tranformer rooms and client switch room, with associated plant and equipment install and connection to new ESB incoming mains. Site works including installation of a new MV ring main including civil engineering/trench works.
https://www.etenders.gov.ie/epps/cft/viewTenders.do?resourceId=5786567
https://www.etenders.gov.ie/epps/cft/viewTenders.do?resourceId=5786567
45215100 - Construction work for buildings relating to health
51000000 - Installation services (except software) CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.