Renewal of HWL from the Mahlenzien waterworks to Kirchmöser (Büdnerweg), 2. Construction phase Text automatically translated in your browsing language Automatically translated
Route description: The start of the measures is at the end of construction of the 1. Construction phase. This is located in the village Kirchmöser-Dorf. The end of the second The construction phase is defined at the DN 150 GG line exit, just before the DB railway crossing in Büdnerweg. The border of the public transport area serves as the eastern border. To the west, the measure area is limited by the public transport area and the existing line road. Part of the route passes through protected areas for various species of birds, bats, reptiles and amphibians, among others. Soil conditions and groundwater: The local soils are predominantly characterised by loose to medium-dense, weakly silty to coarse-grained sands. The sands in their entirety, due to their grain distributions, are classified as frost-proof soils. The sand excavated masses are, with a few exceptions, structurally suitable as pipe supports and for the pipe zone. According to the current state of knowledge, in consideration of the expected water levels and the planned laying depth, sectional groundwater retention measures are necessary. Text automatically translated in your browsing language Automatically translated
https://vergabemarktplatz.brandenburg.de/VMPSatellite/notice/CXP9YNMHYPW
https://vergabemarktplatz.brandenburg.de/VMPSatellite/notice/CXP9YNMHYPW
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.