-
Published30/06/2026
-
Deadline31/07/2026
-
Today11/08/2026
Utilities
- indicates text translated automatically in your browsing language
Brainergy Park Energie GmbH wg. Interior design Energy centre
On the site of the former broadcasting facility on the outskirts of Jülich and in close proximity to the campus of the Aachen University of Applied Sciences, a science park and an innovative industrial park with an area of approximately 52 hectares are currently being built (hereinafter: ‘Brainergy Park Jülich’). The AG has the task of supplying the properties in Brainergy Park with heat. The buildings are to be supplied with heat via an almost CO₂-neutral district heating system. This water-filled LowEx network is operated by a central energy centre, which provides cooling in summer and heat in winter. Heat is supplied decentrally by heat pump systems housed in containers. On the property of Brainergy Park Energie GmbH in Brainergy Park in Jülich, an energy centre will be built as a new wooden construction as part of the expansion of the heating network. The new building is divided into a hall and a 3-storey building. In the EC there is the low voltage with sub-distribution, storage, telecommunications, utility room with heating, and access to the office area in the 1st and 2nd. Upstairs with 14 workstations, meeting room, kitchenette, loggias and sanitary facilities. The subject of this procurement procedure is: - the manufacture of drywall as interior wall and installation wall including door openings - the manufacture of suspended ceilings as grid ceilings - the manufacture of wall cladding - wall cladding with interior plaster as clay plaster - painting work on interior walls - protective measures for all undeveloped surfaces.
https://plattform.aumass.de/Veroeffentlichung/av2806e1-eu
https://plattform.aumass.de/Veroeffentlichung/av2806e1-eu
Type: price
Description: Gewertet werden die Angebote von Bietern, die die Anforderungen an die Eignung erfüllen und mittels der entsprechenden Erklärungen nachgewiesen haben. Die Entscheidung über den Zuschlag erfolgt auf Grundlage des angebotenen Gesamtpreises.
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.