-
Published18/06/2025
-
Today20/07/2025
-
Deadline28/07/2025
-
Opening of tenders29/07/2025
Utilities
- indicates text translated automatically in your browsing language
‘Selection of a contractor for the preparation of a comprehensive report on the assessment of compliance with the basic requirements for construction works and technical control under the ‘Construction’ part and the exercise of construction supervision during construction for the site ‘Construction of a new bridge on a river at km 29+883 on road III-642 Hisarya-Kaloyanovo-road II-64’ Text automatically translated in your browsing language Automatically translated
The subject of this call for tenders is ‘Selection of a contractor for the preparation of a comprehensive report on the assessment of compliance with the basic requirements for construction works and technical control under part ‘Constructive’ and the exercise of construction supervision during construction for a site: ‘Construction of a new bridge on a river at km 29+883 on road III-642 ‘Hissarya-Kaloyanovo-Road II-64’. The purpose of the call for tenders is to appoint a contractor and to conclude a contract with the Road Infrastructure Agency for the preparation of a comprehensive report assessing compliance with the basic requirements for construction works and technical control under part ‘Constructive’ and the exercise of construction supervision during its construction, with a view to carrying out quality construction of the site in accordance with the statutory requirements and meeting the agreed deadlines. Existing situation: The existing structure is a bridge over a river at km 29+883 on road III-642, a monolithic reinforced concrete structure with two openings measuring 14 m and a total length of 29.81 m. It is located between the village of Kaloyanovo and the railway station Kaloyanovo, Plovdiv region. Situationally right, between two contra-curves. Bridge gauge-4 m, without separate sidewalks for pedestrian crossing. It is double-sided with massive reinforced concrete railings. The narrow gauge of the road is signaled by road signs. The cross-section is flat with a static scheme simple beam , with two main beams and 22 cross-members. There are no pistols or camps. The pillar is one piece of stone masonry and is flat foundationed. The stands are walls of stone masonry with a length of 7 m, with flat foundation. There are no wings. The operational qualities and technical parameters of the existing facility do not meet the requirements of the current regulatory framework. A new facility needs to be built. The subject-matter of the contract shall include a description of the activities covered by the contract as follows: A) Stage I - Preparation of a comprehensive report for assessment of compliance with the basic requirements for construction works and technical control under the "Constructive" part of the design development; B) Stage II - Exercising construction supervision during construction, in accordance with the requirements of the Spatial Planning Act (SPA) and the secondary legislation; C) Stage III - Exercising construction supervision during the removal of defects during the warranty periods; D) All other obligations necessary for the execution of the subject of the public procurement and the warranty maintenance of the construction, specified in this documentation and its annexes, as well as those specified in the design and construction contract /engineering / and the legal provisions. *IMPORTANT! A detailed description of the activities covered by the contract is set out in the Technical Specification for the Implementation of the Consultancy Service (Annex B), an integral part of the procurement documents. Text automatically translated in your browsing language Automatically translated
https://app.eop.bg/today/493739
https://app.eop.bg/today/493739
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.