-
Published03/04/2025
-
Deadline15/04/2025
-
Opening of tenders15/04/2025
-
Today17/04/2025
Utilities
- indicates text translated automatically in your browsing language
WFD in Parczew: Renovation of the provincial road No 809 Przytoczno – Kierzkówka – Krasienin – Lublin, section Pryszczowa Góra – Krasienin Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
I. 1.The subject of the order is: Renovation of the provincial road No 809 Przytoczno – Kierzkówka – Krasienin – Lublin, section Pryszczowa Góra – Krasienin, from km 35+600 to km 37+520, with a length of 1,920 km. The scope of works includes, among others: a) carrying out measuring works on linear earthworks with the preparation of geodetic as-built inventory; b) rectifying milling of bituminous surfaces up to 5 cm thick; c) making a trough under a technological band; manual profiling and compaction of the substrate under the structural layers; e) making a concrete foundation without expansion joints under a technological band - the thickness of the layer after thickening 30 cm; f) making a technological band from a mineral-bituminous mixture of broken aggregate with asphalt binder - the thickness of the layer after thickening 10 cm; g) carrying out mechanical cleaning and liquefaction with cold asphalt emulsion of the foundation and bituminous surface; h) making the alignment of the existing substructure with a mineral-asphalt mixture with mechanical incorporation; i) making reinforcement of the ground with geogrids; j) surface made of mineral-bituminous bituminous mixtures - asphalt binding layer - thickness after thickening 5 cm; k) surface made of mineral-bituminous bituminous mixtures - asphalt abrasive layer - thickness after compaction 4 cm; l) making a surface of mineral-bituminous grits mixtures - asphalt wear layer - thickness after thickening 5 cm; m) strengthening the shoulders and slopes of broken aggregate with a grain size of 0-31,5 mm, with a thickness of 10 cm; n) rearrangement of signs or signposts on the post and hectometre signs. 2. The detailed scope of works is included in the design documentation, the project of temporary traffic organization, the Technical Specifications for the Execution and Acceptance of Construction Works and in the bill of quantities of works, which is an auxiliary part of determining the number of works. 3. The design documentation adapts the facility to the needs of all users, including accessibility for people with disabilities. As a public facility after the reconstruction, it will not have accessibility restrictions by all road users, including people with disabilities, which is required by the regulations regarding requirements, among others, for technical conditions to be met by public roads and road engineering facilities (Journal of Laws No. Journal of Laws 2022, item 1518). 4. The bill of quantities is ancillary. Before submitting a tender, the Contractor is obliged to carefully check the number of works with the design documentation. Since the works contract is a flat-rate contract, if more works occur in any position during the course of the works, this cannot be regarded as additional works with a demand for additional remuneration. The possible lack of certain works necessary to perform on the basis of the design documentation in the bill of quantities or in the cost estimate template does not release the Contractor from the obligation to perform them on the basis of the design documentation in the contractual price. The Contractor has the right to adjust the number of works to the size according to his own calculations on the basis of the Project Documentation. II. The Contracting Authority provides for the cancellation of the procedure on the basis of Article 257 of the Public Procurement Law if the public funds that the Contracting Authority intended to use to finance the contract were not granted to it. III. The contracting authority provides for the requirements indicated in Art. 1 in the scope of employment by the Contractor or a subcontractor on the basis of an employment contract of persons performing the activities referred to in point XXVI.1.SWZ in the scope of contract performance. IV. The contracting authority does not allow the possibility of submitting partial tenders - detailed justification is contained in the SWZ. V. In accordance with Art. 1 and 2 of Regulation (EU) 2016/679 of the European Parliament and of the Council of 27 April 2016 on the protection of natural persons with regard to the processing of personal data and on the free movement of such data, and repealing Directive 95/46/EC (General Data Protection Regulation) Urz. EU L 119, 04.05.2016, p. 1), hereinafter referred to as "GDPR", I would like to inform you that: The administrator of your personal data is the Director of the ZDW in Lublin, ul. Bohdan Dobrzańskiego 3, 20-262 Lublin. The inspector of personal data of the Provincial Road Administration in Lublin can be contacted by e-mail: iod@zdw.lublin.pl. Detailed information on: The GDPR can be found in the procurement documents. VI. The contracting authority, in accordance with Art. 1 of the PPL will first examine and evaluate the tenders, and then make a qualitative selection of the contractor whose tender was the highest scored. VII. Deadline for the execution of the order - 3 months from the date of signing the Agreement. VIII. The Contractor shall be bound by the tender until 13 July 2025. The time limit for binding the tender shall run from the expiry of the time limit for the submission of tenders. Text automatically translated in your browsing language Automatically translated
https://zdw-lublin.logintrade.net/zapytania_email,193398,599d1e4c0f7926f23853aa220ebe1be6.html
https://zdw-lublin.logintrade.net/zapytania_email,193398,599d1e4c0f7926f23853aa220ebe1be6.html
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.