Civil engineering and pipe construction services for pipeline construction projects of ONTRAS Gastransport GmbH - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates CPV codes deduced from the text of the procedure

- indicates text translated automatically in your browsing language

Civil engineering and pipe construction services for pipeline construction projects of ONTRAS Gastransport GmbH Text automatically translated in your browsing language Automatically translated

  • Published
    17/04/2025
  • Deadline
    05/05/2025
  • Today
    17/05/2025
Status
Submission closed
Type of contract
Works
Subject for Renewal
No
Buyer
ONTRAS Gastransport GmbH
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: DED51 Leipzig, Kreisfreie Stadt
Business sector (Main CPV)
45230000 Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
Not available
Number of lots
2
Tender reference number
ONTRAS-2025-0006
Description

The subject of this call for tenders is the civil engineering and pipe construction services for the new construction and renovation of various pipeline construction projects. Of these, services for new construction of FGL 307.05, VL FGL 301, VL FGL 215 Section 1 and VL FGL 125 Section 2 are described and awarded in the procurement procedure in Lot 1. Furthermore, the civil engineering and pipe construction services for the refurbishment of FGL 46 (of which approx. These services will be described and awarded in the procurement procedure in Lot 2. Lot 1: The subject of this call for tenders are services for pipe and civil engineering as well as for the non-destructive material testing trade for the construction of three new steel gas pipelines of different diameters and lengths, which are listed below: Interconnection line FGL 307.05 from EUGAL west of Lauchhammer to the gas pressure control measuring system Lauchhammer II with nominal diameter DN 800, pressure step DP 100 and a length of approx. 1,100 m. Interconnection line from the existing FGL 301 at the network junction Lauchhammer to the GDRMA Lauchhammer II with nominal diameter DN 400, pressure step DP 84 and a length of approx. 320 m. Interconnection line from the existing FGL 215 at the network junction Lauchhammer to the GDRMA Lauchhammer II, which consists of two sections: -Section 1: Nominal diameter DN 800, pressure step DP 84 with a length of approx. 342 m from the gas pressure control measuring system Lauchhammer II up to and including a branch valve group; - Section 2: Nominal diameter DN 500, pressure step DP 84 from the junction of the junction valve group to the existing FGL 215 at the Lauchhammer network junction with a length of approx. 80 m. The following plant components must also be built as part of the project: FGL 307.05: Line fittings group DN 800; FGL 215 interconnector: Line fittings group DN 800, pig lock system DN 800, branch fittings group DN 800 with branch DN 500; FGL 301 interconnector: Fitting DN 400 with bypass and ball chamber cover DN 50 Parallel to the three connecting cables, a cable protection pipe system consisting of two cable protection pipes d50 PEHD is to be laid. The implementation of the project is planned to take place in the period March - November 2026, with preparatory construction measures, such as the felling of trees, already starting in January 2026. However, it should be noted that the actual start of construction depends on the permitting process and therefore cannot yet be predicted with certainty. This fact must be taken into account when submitting a tender. Lot 2: The FGL046 pipeline, DN 600 DP 63, runs from the Schkeuditzer Kreuz NKP to Kirchheilingen. As part of the LHyVE project, the Milzau - NKP Schkeuditz section is to be converted to the transport of hydrogen. The project includes the necessary remediation of weaknesses, the separations and the connections to be established in this section. In addition, there are necessary replacements of existing valves due to unsuitability for hydrogen transport. The overall project comprises a total of 20 measures. Measures MN 15 and MN 14 will be implemented in 2027. The remaining 18 measures will be implemented in 2026. The material (pipes, fittings, fittings, etc.) is provided by the customer according to the material BOM created and approved in the planning. Text automatically translated in your browsing language Automatically translated

Submission Method
Not available
Tenders may be submitted
Electronic submission: eu.europa.publications.PublicProcurement.electronic.submission.not-allowed
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.