-
Announced25/04/2025
-
Today15/05/2025
-
Estimated published02/06/2025
Utilities
- indicates text translated automatically in your browsing language
Iceberg Hall - earth, canal, masonry and concrete works Text automatically translated in your browsing language Automatically translated
- Excavation incl. topsoil: approx. 1,200 m3 - excavation for deep foundations: 270 m3 - Trench excavation: 400 m3 - Re-installation of excavated material: approx. 1,000 m3 - basic lines: 800 m - gravel, KFT, recycled material, capillary breaking layer: approx. 3,000 tons - make new floor sleeves in existing floor slab: approx. 32 pcs - masonry d=11,5-24 cm: 45 m2 - in-situ concrete pillar Ø 80-140 cm for deep foundation: approx. 255 m3 - Foundations and foundation wells: 150 m3 - floor slabs d=20-25cm with base: 1145 m2 - reinforced concrete walls d= 20-30cm: approx. 880 m2 - reinforced concrete slabs d=20-25: 95 m2 - Stacking of concrete walls: 550 m2 - perimeter insulation: 270 m2 - Reinforcement connections to existing walls: approx. 115 m connection length - reinforcing steel: approx. 90 to Text automatically translated in your browsing language Automatically translated
https://www.vergabe24.de/
https://www.vergabe24.de/
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.