-
Published21/08/2025
-
Deadline14/10/2025
-
Opening of tenders14/10/2025
-
Awarded11/02/2026
-
Today10/06/2026
Utilities
- indicates text translated automatically in your browsing language
Lots 6 and 7 - Road construction, preloading
New construction line B 198 Mirow bypass on 8,282 km including 2 estuaries and 2 nodes (similar to the plan), ground improvement overflow method on 960 m length and partly with vertical drainage, new construction of civil engineering structures (passages), new construction of economic routes and cycle paths, new construction of drainage systems, expansion of district road MSE 20 beyond node with OU in two sub-sections (1st sub-section = 435 m, 2nd sub-section = 246 m) incl. new construction of drainage systems
https://www.meinauftrag.rib.de
https://www.meinauftrag.rib.de
Type: price
Description:
Weight (percentage, exact):
Postal address:
Town: Halle
Postal code: 06112
Country:
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.