-
Published10/12/2024
-
Deadline16/01/2025
-
Today11/08/2026
Utilities
- indicates text translated automatically in your browsing language
Krummennaab - Social Centre 301 - Electrical installation
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The building with a residential and office building as well as hall buildings was used by Weidener as a sports fashion factory until 2022. The building was built around 1965. The municipality of Krummennaab intends to use the factory premises as a social centre, for which the buildings are to be renovated and rebuilt. Nature and scope of the service: 1 pc photovoltaic system 30 kWp; 1 pc main distributions; 19 pcs sub-distributions; 2 pcs low-voltage distributors; 14500 m cables / lines; 3200 m installation systems / pipes; 1500 pcs installation equipment; 120 pieces of bulkheads; 7000 m FM lines; 230 pcs lighting fixtures; computer cabling; sun protection system; Antenna system; Intercom
https://plattform.aumass.de/Veroeffentlichung/av2408c2-eu
https://plattform.aumass.de/Veroeffentlichung/av2408c2-eu
Type: price
Description: Preis
Weight (percentage, exact): 100
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.