-
Awarded29/11/2024
-
Today18/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Amusement dredging Elbe 2025 / 2027 Text automatically translated in your browsing language Automatically translated
The works to be carried out are dredging works to maintain and restore the required target depths and widths in the fairway and in the fairway of the Lower and Outer Elbe. The total service includes the dredging of 34 million m3 within a 24 month contract period. The contract starts on 01.05.2025. The contract ends on 30.04.2027. The dredging work (14.5 million m3/a soil volume) shall be carried out with a maximum of two dredging machines. During the contract period, a wider dredging device is also to be used for four campaign dredging operations: 1st + 4th campaign: 1 million m3 in the period 01.07.-29.07.2025 and 01.07.-29.07.2026, 2nd + 4th campaign 1.5 million m3 in the period 03.03.-14.04.2026 and 02.03.-14.04.2027. Text automatically translated in your browsing language Automatically translated
45244100 - Marine installations
45252000 - Construction works for sewage treatment plants, purification plants and refuse incineration plants CVP code deduced from the text of the procedure AI-generated
45250000 - Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.