New elementary school, care home and multipurpose hall in Neuweiler
As part of the long-term development of the municipality's education, care and sports infrastructure, several coordinated building construction measures are planned in the coming years. The background to this overall measure are both legal requirements in the area of all-day care as well as structural, functional and age-related deficits in existing buildings. In order to ensure a sustainable and economic offer, a total of three individual projects are to be implemented. A first focus is on the new construction of a care house with canteen and full-day care. With the introduction of the legal entitlement to full-time care, there is an increased need for additional care, accommodation and catering areas. It is therefore planned to build a modern building with a cafeteria, dispensary kitchen, care rooms, sanitary facilities and additional ancillary areas. The aim is to sustainably expand the care capacities and strengthen the school infrastructure. The second measure is the demolition of the existing multi-purpose hall and the construction of a modern 1.5-field sports hall. The existing building has significant structural damage as well as technical and age-related defects. Economic restructuring is only possible to a limited extent. In the future, the planned new building will serve both school sports and the use by local clubs and community events. In addition, a modern building structure should enable flexible multiple use. The third construction phase includes the new construction of the Neuweiler Elementary School. In the long term, the existing school building no longer meets today's requirements for modern learning environments, technical equipment, energy efficiency and room structure. Therefore, a modern school building with classrooms, specialist rooms, administrative areas, residential areas and outdoor facilities is planned. The aim is to create a sustainable and future-proof school location. The measures are coordinated over time so that an orderly and economic implementation can take place. The first action is scheduled to start in 2027. The complete completion of all projects is planned until 2038. For project 1 – care centre with cafeteria and all-day care, the architectural firm Großmann has already provided planning services for building planning in phases 1 to 3. In addition, an overall urban planning concept in the form of a mass study for the planned overall measures was also drawn up by the architectural firm Großmann. This includes the spatial development of the entire area as well as the conceptual coordination and chronological sequence of the three planned projects. The aim of the study is to ensure an orderly, economical and functional implementation of the individual construction phases. Timetable: Project 1 – Care centre: - Until December 2026: Preliminary planning and building application - early 2027: approval phase (4-6 months); Parallel: Plant planning, LV creation, call for tenders - mid-2027: Start of construction - 2029: Completion of Project 2 - Multipurpose hall - 2029: Start of the project - 2030-2032: Planning and construction - 2033: Completion of Project 3 - Elementary School Neuweiler - 2034: Start of project - 2035-2037: Planning and construction phase - 2038: completion
https://www.subreport.de/E98516644
https://www.subreport.de/E98516644
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.