Publications Office of the EU
"SELECTION OF ENGINEERING EXECUTIVES (DESIGN, CONSTRUCTION AND AUTHORITY SURVEILLANCE) FOR THE ENERGY RENEWABLE OF MANAGING RESIDENTIAL BUILDINGS IN THE LEVEN CITY TERRITORY IN RELATION TO THE PROCEDURE "SUPPORT FOR SUSTAINABLE ENERGY RENEWAL OF THE RESIDENTIAL BUILDING FUND - PHASE I" FOR BUILDINGS, by two lots. - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates CPV codes deduced from the text of the procedure

- indicates text translated automatically in your browsing language

"SELECTION OF ENGINEERING EXECUTIVES (DESIGN, CONSTRUCTION AND AUTHORITY SURVEILLANCE) FOR THE ENERGY RENEWABLE OF MANAGING RESIDENTIAL BUILDINGS IN THE LEVEN CITY TERRITORY IN RELATION TO THE PROCEDURE "SUPPORT FOR SUSTAINABLE ENERGY RENEWAL OF THE RESIDENTIAL BUILDING FUND - PHASE I" FOR BUILDINGS, by two lots. Text automatically translated in your browsing language Automatically translated

  • Published
    12/06/2025
  • Today
    09/07/2025
  • Deadline
    16/07/2025
  • Opening of tenders
    17/07/2025
Status
Published
Type of contract
Works
Subject for Renewal
No
Buyer
ОБЩИНА ПЛЕВЕН
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: BG314 Плевен
Business sector (Main CPV)
45211340 Multi-dwelling buildings construction work
Total estimated contract value (excluding VAT)
1,920,105.31 BGN
Total final contract value (excluding VAT)
Not available
Number of lots
2
Tender reference number
486789
Description

During the execution of the contract, the following should be carried out: design, construction and supervision of the energy renovation of multi-family residential buildings on the territory of the Municipality of Pleven, which have been approved by the Ministry of Regional Development for funding under the procedure ‘Support for sustainable energy renovation of the residential building stock – Stage I’. The execution of the public procurement includes the activities related to the preparation of an investment project in the technical design phase, the execution of the necessary works, as well as the exercise of author's supervision during the construction. Implementation through engineering is envisaged, which should include three main groups of activities: 1. Activities related to the development of an investment project in the technical design phase of the site; 2. Activities related to the execution of author's supervision during the execution of the construction and installation works (CMP) on the site and 3. Activities related to the execution of construction and installation works for the realization of the site. Sustainable energy renovation of a multi-family residential building in Pleven, 14 Danail Popov Str. Prescribed energy-saving measures for a residential part to improve the energy performance of the building: MEASURE B1 Thermal insulation of exterior walls MEASURE B3 Thermal insulation of roof MEASURE B4 Thermal insulation of under MEASURE B5 Replacement of windows and doors MEASURE C12 - Introduction of energy-saving lighting in the common areas of the residential building. MEASURE YOU IN THE Energy Efficiency Audit Report on page 55, For the residential part, Package 1+I, selected in the Energy Efficiency Certificate, is proposed for implementation. Total built-up area – 4154.98sq.m. Floors: -overground-6 -underground-1 Prescribed energy saving measures for Commercial part to improve the energy performance of the building: MEASURE B1 Thermal insulation of exterior walls MEASURE B3 Thermal insulation of roof MEASURE B4 Thermal insulation of under MEASURE B5 Replacement of windows and doors In the Energy Efficiency Audit Report on page 69, For the commercial part, Package 1 selected in the Energy Efficiency Certificate is proposed for implementation. Total built-up area - 566.90 sq.m. Floors: -overground-6 -underground-1 The residential and commercial parts of the building are planned for implementation. Sustainable energy renovation of a multi-family residential building in Pleven, Kosmos-72 block, Pleven, 5 Stoyan Zaimov Str. Prescribed energy-saving measures to improve the energy performance of the building: MEASURE B1 Thermal insulation of exterior walls MEASURE B3 Thermal insulation of roof MEASURE B4 Thermal insulation of under MEASURE B5 Replacement of windows and doors MEASURE C12 Measures under lighting systems Energy-saving measures for the recovery of energy from renewable sources Built-up area - 5748.20 m2. Number of floors: -overground-13 -underground-2 Text automatically translated in your browsing language Automatically translated

Submission Method
Electronic via:
https://app.eop.bg/today/486789
Tenders may be submitted
Electronic submission: required
https://app.eop.bg/today/486789
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
17/07/2025 13:30
CPV code

45211340 - Multi-dwelling buildings construction work

45320000 - Insulation work

45321000 - Thermal insulation work

45400000 - Building completion work CVP code deduced from the text of the procedure AI-generated

71300000 - Engineering services CVP code deduced from the text of the procedure AI-generated

71000000 - Architectural, construction, engineering and inspection services CVP code deduced from the text of the procedure AI-generated

Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.