-
Published19/03/2025
-
Today30/04/2025
-
Deadline13/05/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
AS35 Expansion Baar – Zug (ABZ): Planning Technical installations - construction project up to commissioning (SIA subphases 32-53) Text automatically translated in your browsing language Automatically translated
The capacity expansion on the Zurich-Zug-Lucerne line decided in STEP AS 2035 requires extensive infrastructure expansion in order to remove this bottleneck. The most important element is the Zimmerberg Base Tunnel 2 between Thalwil and Litti. In addition, infrastructure expansions are needed at Baar, Baar Neufeld, Baar Lindenpark and Zug stations, as well as a third track between Baar and Zug. SBB has developed a preliminary project for the expansion between Baar and Zug. The integration of a third track requires the adaptation of the stations and stops on the affected section. An additional 4 will be built at Baar station. Perron edge. At Zug station, the entire Nordkopf has to be adapted to the new track topology and a new passenger underpass is to be built at the same time on behalf of the city of Zug. The project is divided into four main areas: - Baar station area: Reconstruction of the station in stages and new construction 4. Perron edge. Construction of a new passenger underpass and adaptation of the existing underpass. Replacement new construction or adaptation of three underpasses. - Baar Train area: Construction of the third track with adaptation of two stops. Replacement of two underpasses. New construction of a bridge over the city tangent and new construction of a passenger underpass. - Train area: New construction of the track system in the northern area of the station in various stages. Conversion of the existing and new building of an additional storage facility. Various adaptations in the area of public facilities and new construction of a passenger underpass for district and railway development. - Zug Chollermüli area: New construction of a lane change and a shift post. The planning of the technical facilities includes the planning and construction management of the following departments from the construction project phase: - HVAC systems - Electrical systems Text automatically translated in your browsing language Automatically translated
tdf-non-av
71000000 - Architectural, construction, engineering and inspection services
71300000 - Engineering services CVP code deduced from the text of the procedure AI-generated
45000000 - Construction work CVP code deduced from the text of the procedure AI-generated
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork CVP code deduced from the text of the procedure AI-generated
45234000 - Construction work for railways and cable transport systems CVP code deduced from the text of the procedure AI-generated
Type: quality
Description: Zuschlagskriterien
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.