-
Published21/10/2025
-
Today16/11/2025
-
Deadline24/11/2025
-
Opening of tenders24/11/2025
Utilities
- indicates text translated automatically in your browsing language
F07-001-02 Stainless steel basin Text automatically translated in your browsing language Automatically translated
The association SB Bayern 07 is renovating the existing outdoor pool Bayern 07 at Pulversee 1 in Nuremberg.In March 2026, the demolition of the existing supervisory and technical building (about 650 m3) and a partial demolition of the two large pools begins. Entrance buildings, changing rooms and sanitary areas remain unaffected.Two new stainless steel basins will be built at a new location and in a higher location on the site. A new technical building with WU basement houses all the technology for the swimming pool, a supervisory area and a changing and wet area for the disabled. The ground floor of the building is bricked and plastered on the outside. The roof is a slightly inclined rafter roof with green roof.The entire outdoor areas are advertised in a second LV package and include the paving, green areas and fences. Text automatically translated in your browsing language Automatically translated
https://staatsanzeiger-eservices.de
https://staatsanzeiger-eservices.de
Type: price
Description:
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.