Published04/08/2025
-
Deadline02/09/2025
-
Today12/09/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
HZS Plzeň area
The subject of the Work ‘Areál HZS Plzeň’ is: 1) Preparation of the Building Design (study), which will be processed to determine the new form. The agreed final version of the Building Design (study) will be finalized in the next stages of documentation. Without the approval of the Building Design (study), it is not possible to proceed to the next stages of documentation. 2) Preparation of the Project Documentation for Transport Infrastructure Construction Permit (DPS), which specifies the subject matter of the Work to the extent that it can be discussed in the project permit procedure, obtain a final project permit (construction permit) pursuant to Act No 283/2021, the Construction Act, (hereinafter referred to as the ‘Building Act’), including the Notified Body’s Opinion at the stage of issuing the project permit and the activities of the OSH coordinator when working on the construction site in the preparation phase, including the preparation of the OSH plan on the construction site and the maintenance manual. 3) Processing and submitting an application for the issue of a project permit pursuant to the Building Act, including all the required documents, the result of which will be the issue of a project permit (construction permit). The Contractor shall cooperate in issuing the relevant decisions until they become final. 4) Preparation of Project Documentation for Railway Construction (PDPS) in BIM mode, which elaborates and defines the requirements for the construction into details that specify the subject matter of the Work to the extent that it forms the basis for the tender for the construction of the construction, including the assessment of conformity or suitability for use of the interoperability constituent or the EC declaration of verification of the subsystem by the notified body. 5) Processing of the Work in BIM mode and creation of the BIM Information Model according to SOD Annex No. 11 BIM protocol, including all its annexes. The information model is a part of the Work and will be processed, discussed and handed over continuously and together with other parts of the Work according to the Performance Schedule according to Annex 5 to the SOD. 6) Updating the project plan according to the Rules for the preparation and implementation of transport infrastructure actions financed by the State Fund for Transport Infrastructure (hereinafter referred to as the ‘MoT Rules’). The scope of this performance is reserved by the Client as a change of the contractual obligation in accordance with Section 100(1) of the Act. The Contractor shall carry out the performance on the basis of the Client's instructions if the anticipated investment costs are exceeded by 10% or if the technical solution of the construction is substantially changed. 7) Performance of the Designer's supervision during the construction of the PDPS and during the execution of the construction. Detailed specification of the subject of performance of the public contract is regulated in other parts of the tender documentation.
https://zakazky.spravazeleznic.cz
https://zakazky.spravazeleznic.cz
71322000 - Engineering design services for the construction of civil engineering works
71311230 - Railway engineering services
71317210 - Health and safety consultancy services
71248000 - Supervision of project and documentation
71246000 - Determining and listing of quantities in construction
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.