-
Published25/03/2025
-
Deadline22/04/2025
-
Today22/04/2025
Utilities
- indicates text translated automatically in your browsing language
2025-03-ottweiler-gs-lehbesch-anbau-tp Text automatically translated in your browsing language Automatically translated
At the primary school Lehbesch in Ottweiler, the afternoon area must be extended so that there is an afternoon care place for every elementary school child. Preliminary planning showed that this is only possible through an extension to the existing school building. A first design idea is that the new part of the building should be added to the existing afternoon care in a south-easterly direction (see building window). Since the site slopes down to Dr. Maximilian-Rech-Straße (see section of the site), a 2-storey construction is recommended. The barrier-free flat roof extension with green roof is to be built in timber frame construction, alternatively in timber frame construction. The room design and layout are based on the "Guidelines for efficient school buildings in Germany". This means that in addition to learning and working areas, a differentiated range of accommodation and recreation areas within the new building will also be offered. The rooms should be usable for different activities, individual sub-areas can be combined with each other as required and the access zones for learning, work and recreation phases can also be activated. A long-term basic element for durability is above all inner flexibility and changeability. In addition, the costs of management and maintenance (life cycle costs), the principle of environmental compatibility and the greatest possible conservation of resources in the sense of sustainable construction must be taken into account. Building key data/ Technical specifications: Gross floor area max. 900 m2 gross volume max. 8,000 m3 total construction costs (cost groups 200, 300, 400, 500, 600, 700) max. 4,000,000 EUR. The subject of this procedure is the award of engineering services structural design in accordance with § 51 HOAI (performance phases 1-5). The client reserves the right to commission individual service phases in stages. There is no legal claim to the transfer of all service phases. In case of call-up of service phases, the contractor is obliged to provide the respective services. The new building is expected to receive public funding. Text automatically translated in your browsing language Automatically translated
https://www.dtvp.de/Satellite/notice/CXP4YC15LD8
https://www.dtvp.de/Satellite/notice/CXP4YC15LD8
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.