-
Published09/02/2012
-
Deadline19/03/2012
-
Opening of tenders19/03/2012
-
Awarded30/05/2012
-
Today08/08/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
NO-Oslo: development of non-residential real estate
Planning consultant: payment in accordance with elapsed time.
Preparation of development plan.
A complete proposal for a development plan shall be provided for the two prison properties with adjacent areas, ready for political consideration.
The contract includes a mapping and analysis of the current situation and the Norwegian Correctional Services’, prisons’ and Statsbyggs future needs. On the basis of the analysis an overall development study, suitable as a basis for discussions between the Correctional Services and Bergen Municipality, shall be prepared. The study shall be prepared on a principal and overall level, and shall form the basis for decisions relating to the development plan's provisions. The material for the study shall be appropriate to illustrate the proposed development plan.
Delineation of the planning area, type of plan (area or detailed plan) and whether the proposed plan will trigger the requirement for an environmental impact assessment, has not been established. This will be clarified in consultation with Bergen Municipality before this assignment comprises.
Postal address: Postboks 2304, Solheimsviken
Town: Bergen
Postal code: 5824
Country: NOR
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.