-
Published17/08/2026
-
Today10/09/2026
-
Deadline14/09/2026
-
Opening of tenders14/09/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
24-006-FRR educational and meeting place "ROBBE" / new construction of the kindergarten - construction phase 01
The new construction of a two-storey KiTa (1st floor) is planned in 3 construction phases. BA), the demolition of the existing skits (2.BA) and the new construction of a two-storey family centre (3.BA). On the property there is the three-storey town hall in the western part, another part of the property is still built with a one-storey KiTa. It is planned that this will be dismantled as soon as the new KiTa can go into operation. The new buildings KiTa and Familienzentrum as well as the existing council house are accessed via a square south of Buchbergstrasse. On the ground floor, the KiTa houses 4 group rooms for children U3 I Ü3, which are oriented eastwards towards the KiTa open spaces. In the western part of the building, a large multipurpose room, dining room, kitchen and staff rooms are arranged. The administrative rooms of the day care centre form the transition to the one-storey mini club in the northern part of the building. The mini club receives as use the day care with 2 other group rooms. Upstairs there are further group rooms. The floor plan is similar to the ground floor, the group rooms are arranged in the east with an upstream arcade, which is designed together with the external staircase in addition to the escape route function, also as a further outdoor play area. A large roof terrace is planned in the southern part of the building. The first construction phase includes the new construction of KiTa and day care for children and is positioned in such a way that an open area of the existing KiTa can be maintained and kept in operation as far as possible, but still a separate open area of the new day care centre on the eastern border of the area can be created later. The 2nd The construction phase includes the relocation of the existing day care centre to the new building and the subsequent dismantling of the existing kita. The third construction phase concerns the new construction of the family centre at central Ste le. Here, too, the operation of the new KiTa and its accessibility for the transition phase of the new family centre is almost completely guaranteed. The new building of the KiTa comprises 7 groups - U3 I Ü3 - with a maximum of 147 children on the ground and upper floor. 2 group rooms are planned for the Kindertagespflege I Miniclub, where up to 27 children can be cared for during the day. The number of employees amounts to a maximum of 18 people on the ground floor and a maximum of 9 people on the upper floor. The kitchens on the ground and upper floor are operated with about 4-6 employees. All uses in the KiTa and day care are limited to services.
https://www.subreport.de/E64477177
https://www.subreport.de/E64477177
45311000 - Electrical wiring and fitting work
45200000 - Works for complete or part construction and civil engineering work
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.