VE 04 Carcass work

  • Published
    08/07/2024
  • Deadline
    05/08/2024
  • Opening of tenders
    05/08/2024
  • Today
    12/10/2026
Status
Submission closed
Type of contract
Works
Subject for Renewal
No
Buyer
Bezirksamt Marzahn-Hellersdorf von Berlin
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: DE300 Berlin
Business sector (Main CPV)
45214200 Construction work for school buildings
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
Not available
Tender reference number
ZVB24094
Description

The tendered service includes the structural work in the existing building (old building) as well as the extension of the existing building (new building). Actions: - construction site, safety and protection facilities, documentation documents, construction site installation plan, investigations for waste declaration, surveys, concrete monitoring, plant and assembly planning, investigations for waste declaration as well as sampling for own services - demolition and disposal works, among others: 93 m3 demolition tr. masonry after installation fall beams etc., d= 30-72 cm 18 m demolition brick / steel lintels incl. masonry, plaster d= up to 50 cm 284 m perpendiculars, smooth louvres MW walls d= 30-72 cm 646 m2 demolition steel stone ceiling, d= 12.5 to 21 cm, partly on receipt of the steel beams 66 m2 demolition wooden beam ceiling 15 m demolition steel beam HEA 180 253 m2 milling surfaced concrete, d= 5 to 15 mm 1925 m2 demolition ceiling plaster, 5595 m2 demolition wall interior plaster, d= 2-3 cm 741 m demolition laminating interior plaster window, d= 2-3 cm, D= 15-30 cm 190 m demolition plaster, masonrying of ceiling steel beams, H= 200-340 mm, W= 120-290 mm 225 m2 demolition wall-exterior plaster, d= 3-4 cm 6 St demolition light shafts masonry, shaft covers light shafts 28 m demolition masonry crown light shafts, h= 13 cm 930 t AVV 170107, AVV 170904, AVV 170405, AVV 170201, AVV 170202, AVV 170802, AVV 170407, AVV 170302 disposal, transport of coal tar-containing bitumen mixtures, AVV No 170301* earthworks, etc.: 73 m3 excavation excavation excavation, manual excavation, elevator underpass 462 m3 filling floor supply 63 m3 embankments, work rooms elevator underpass fill, compact, manual work 25 m3 interior underground fill, compact, manual work 50 m2 fine plan indoor area, manual work 60 m3 excavation underpinnings, b/h= 50-1.50/1.88 m, stepped, in 21 sections, manual excavation 857 m3 excavation excavation excavation excavation excavation pit, h= 0.65-0.95 m, as well as individual foundations partially mechanically in manual excavation 165 m3 soil exchange 374 m3 excavation pit, single foundations fill, compact 764 m2 fine planum excavation bottom, single foundations 2100 t AVV 170504 soil, Z0-Z1.2, Z1.2-Z.2, recovery; AVV 170504 Soil, >Z.2, Disposal 1 Psch Water management measures during the construction period 20 m root protection curtain -Special underground works: 67 m3 of underpinning -concrete work, inter alia: subsequent works including formwork 144 m2 walls, C 25/30, tr, d=20-24 cm, smooth 30 m openings shells, concrete, angular, d= 20 cm 208 m2 ceiling C 25/30, tr, d=20 cm 410 m2 ceiling LC 25/28, tr, d=12 cm 830 m2 separation layer, PE film 0.2 mm 8 m2 foundation slabs, C 30/37 WU, tr., d= 30 cm 50 m2 floor slab C 25/30, tr, d=20 cm 33 m3 lean concrete, underlays, C35/45, stepped, in 21 sections 762 m2 cleanliness layer, C 8/10, d= 5 cm 917 m2 perimeter insulation under / vertical on floor slabs and foundations, d=50 mm/80 mm 579 m2 floor slabs, C 35/45, tr, d=30 cm or d=60 cm 63 m3 single foundations 3545/b. 146 m2 roof slab, semi-finished, C 35/45, tr., d=22 cm, 619 m2 roof slab (ribbed slab), C 35/45, tr., d=18cm, SB2 60 m2 floor slab, C 35/45, tr., d=16 cm, in existing slab girder 1377 m2 floor slab, C 35/45, tr., d=18-20cm 203 m2 dovetail steel sheet with screed concrete C30/37, reinforcement, d= 15 mm, impact sound insulation 1148 m2 walls, C 35/45, tr., d=24 cm, SB2 33 columns C 35/45, tr., b/d=24/24 to 70/24 cm, SB2 76 m2 attic, C 35/45 tr., d=24 cm 104 m2 parapets, outside, C 35/45, tr., d=24 cm, SB2 415 m beams, C 35/45, tr., d=24 cm, SB2 27 m beams, C 35/45, tr., d=24 cm, SB2 32 m uprights, inside, C 35/45, tr., d=12.5 cm 1205 m ribs, inside, C 35/45, tr., d/h=15/27 to 24/52 cm, SB2 1 st stairway, C 30/37, tr. prefab., w=1,87 m, 5 pcs. 212 t reinforcing steel B 500 A 2264 m2 load-bearing scaffolding B Ceilings 1486 m load-bearing scaffolding B, Formwork wall-like beams, ribs and beams 318 St Concrete inlays: Fastening rails, A4 850 m Concrete inlay work: Electrical installation pipe PVC-U AD 25 to 63mm, reinforcement 924 St Concrete inlay work: Appliance and appliance junction boxes, junction boxes, ceiling boxes 940 St Concrete inlays: Wall and ceiling transitions 20 m Basic cables TWL DN40 60 m Basic cables SWL DN100 -Hinged ventilated facade cladding made of prefabricated reinforced concrete parts: 669 m2 Mineral insulation, d= 160 mm, WLG 035, precast reinforced concrete elements, d= 12 cm, w= 0.54 to 9.81m, h= 0.85 to 4.05 m, incl. 25 kg/m2 reinforcing steel B 500 A, incl. installation parts made of stainless steel -masonry work, etc.: 24 pcs 2 x brick flat lintel, W/H= 17.5/7.1 cm, LB 101-113.5 cm 3 pcs 3 x brick flat lintel, W/H= 11.5 or 17.5/7.1 cm, LB 113.5 cm 262 m masonry between spaces steel lintels and ceiling beams 33 pcs close openings in tr. existing walls, d= 24-42 cm 42 m2 wall masonry, inside, d= 24 -36.5 cm 108 pcs create supports in MW 36 m masonry window parapets, add 610 m slits create walls, close 32 m2 KS-P masonry, thin-bed mortar steel construction work, etc.: 96 m steel girder, lintel, with fire protection clothing F90 190 m renovation existing ceiling steel girder 14 pcs replacement ceiling steel girder with fire protection clothing F90 core bores: 132 pcs core drilling in tr. ceiling, d=80-150 mm, thickness 18-20 cm 179 pcs core drilling in MW walls, d=80-180 mm, thickness 10-60 cm 260 m2 levelling cleaning on external wall, d= 10 mm

Submission Method
Electronic via:
https://www.meinauftrag.rib.de
Tenders may be submitted
Electronic submission: required
https://www.meinauftrag.rib.de
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
05/08/2024 10:15
Place of performance
Award method
Criterion:
Type: price
Description: 100% Preis
Weight (percentage, exact):
Estimated value
Not available
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.