Published05/03/2025
-
Deadline10/03/2025
-
Awarded04/08/2025
-
Today12/10/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Execution of construction works along with maintenance and servicing of installed equipment for two investment tasks carried out in the military complex in Sochaczew: Task 01847: Reconstruction of roads in the Phase I B - Part II complex – guaranteed contract; Task 01816: Reconstruction of roads in the complex Stage I A - Evacuation route - optional order (right of option) Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
Guaranteed The scope of the construction project includes: • construction of paved surfaces, including internal roads, parking spaces and pedestrian paths, maneuvering yards, • construction of a low-voltage 0.4 kV power and lighting installation, • construction of a telecommunications installation, • construction of an external rainwater drainage installation with pre-treatment equipment, retention tanks and a pumping station. • reconstruction of ditches with the construction of culverts under roads In addition, it is envisaged to carry out works that do not require a building permit and a demolition permit: • demolition of building No 20, • demolition of existing paved surfaces, • demolition of existing external installations, • demolition of part of the railway siding, • felling of greenery, • construction of small architecture facilities (burners, benches, trash cans), • execution of necessary earthworks , together with the removal of unneeded land mass outside the complex up to 30km, • restoration of green areas. Optional Contract – Optional Law The scope of the construction project includes: • budowę zjazdu z Drogi Krajowej nr 50 na teren kompleksu wojskowego wraz z posadowieniem przepustu, • zabezpieczenie sieci teletechnicznej pod zjazdem, • wykonanie frezowania warstwy ścieralnej, • konstrukcje poszerzenia nawierzchni i wykonanie jednolitej konstrukcji górnej warstwy DK50, • budowę chodnika wzdłuż DK50, • przebudowę rowów wzdłuż DK50, • odtworzenie wraz z przebudową czterech zjazdów na działki prywatne wraz z wykonaniem przepustów pod zjazdami, • budowę wysp dzielących na DK50, • wykonanie oznakowania poziomego i pionowego wraz z wydzieleniem dodatkowego pasa do skrętu w lewo, • wykonanie słupów wraz z panelami fotowoltaicznymi do zasilania znaków pionowych Termin wykonania zamówienia 1) Zamówienie Gwarantowane Czas realizacji zadania inwestycyjnego nr 01847: - completion of construction works confirmed by the written Protocol of the Commission's Final Acceptance: up to 1000 days from the date of signature of the contract Optional Order – Option Law: Time of realization of investment task no. 01816: - completion of construction works confirmed by the written Protocol of the Commission's Final Acceptance: a maximum of 360 days from the date of notification of the exercise of the option to the contractor. The deadline for notifying the CONTRACTOR about the exercise of the option right is set up to 240 days from the date of signing the contract Text automatically translated in your browsing language Automatically translated
45314000 - Installation of telecommunications equipment CVP code deduced from the text of the procedure AI-generated
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork CVP code deduced from the text of the procedure AI-generated
45231000 - Construction work for pipelines, communication and power lines CVP code deduced from the text of the procedure AI-generated
45233000 - Construction, foundation and surface works for highways, roads CVP code deduced from the text of the procedure AI-generated
Type: price
Description: 100
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.