-
Published05/08/2026
-
Deadline28/08/2026
-
Today13/09/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
(ProVia-ID 159561) St. Pölten - Traisen - Hainfeld / Freiland (Traisentalbahn); Attractiveness, construction; Bf. Traisen - St. Pölten central station; Expansion of traffic stations - steel, wood, metal and glass construction
Electrification and attraction is foreseen for line 1072 / St. Pölten Hbf. - Traisen, for line 1071 / Traisen - Hainfeld and for line 1511 / Traisen - Freiland. The measures can be found in the submission planning for the railway infrastructure between St. Pölten to Traisen, Traisen to Hainfeld and Traisen to Freiland and have the following main objectives: Upgrade of existing lines: Along the existing line, general modernisation measures (safety measures at level crossings, etc.) are being taken to enable shorter travel times. In order to ensure the efficient operation of passenger transport, existing crossing possibilities need to be improved. Electrification: The infrastructure expansion includes the electrification of the entire railway line between St. Pölten to Traisen, Traisen to Hainfeld and Traisen to Schrambach. This step will lead to a CO2 reduction and thus make an important contribution to climate and environmental protection. The following measures are foreseen for the project area: Reconstruction of the overhead contact line from St. Pölten to Traisen, reconstruction of the overhead contact line from Traisen to Schrambach, reconstruction of the overhead contact line from Traisen to Hainfeld, construction of a state-of-the-art safety system with integration into the Vienna Operations Centre, reconstruction/adaptation/reconstruction of the existing EK facilities according to EisbKrV 2012, the railway crossings or non-public railway crossings, area-by-area superstructure works on the line and in the operating points, area-by-area substructure works on the line and production of a cable trough, area-by-area renovation of trench walls and passages, area-by-area renovation of retaining walls and embankment protections, adaptation of the stations and stops with partial renewal and extension of the existing platforms. The ggstl. Process includes the necessary structural works in the course of the expansion, in particular the steel, wood, metal and glass construction in the course of the expansion of the transport stations.
https://www.provia.at
https://www.provia.at
45234000 - Construction work for railways and cable transport systems
71000000 - Architectural, construction, engineering and inspection services
Type: price
Description: siehe Ausschreibungsunterlagen
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.