-
Published02/09/2025
-
Deadline29/09/2025
-
Awarded12/12/2025
-
Today12/05/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
2. Munich S-Bahn trunk line, Munich HBF, construction supervision service interim station [VE5401 HI]
The new interim station will be required in order to place the users and tenants of the existing buildings, which will be successively demolished, in the immediate vicinity of the long-distance railway tracks during construction and temporarily. In addition to the construction of the building for the interim station, the construction contractor must implement conversion measures on the ground floor of the existing southern edge, as a sufficiently large connection to the transverse platform of the platform hall must be ensured there. The overall interim station measure to be monitored by AN BÜW is divided into the following sub-measures: • New interim station (IBF for short) incl. technical installations (except for the telecommunications trade) and equipment • Expansion measures in the border building South Ground floor incl. technical installations (except for the telecommunications trade) • Outdoor installations
https://bieterportal.noncd.db.de/evergabe.bieter/api/supplier/external/deeplink/subproject/71179914-ab7c-4174-ba6e-0a48751800ef
https://bieterportal.noncd.db.de/evergabe.bieter/api/supplier/external/deeplink/subproject/71179914-ab7c-4174-ba6e-0a48751800ef
71521000 - Construction-site supervision services
45200000 - Works for complete or part construction and civil engineering work
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.