D-Leipzig: track construction works
Leipzig/Halle Airport – “Interconnection track airport – title 1 extension of tracks + Title 2 transhipment area + Title 3 Renovation of existing tracks”.
The procurement unit shall consist of carrying out the following essential tasks:
Title 1:
— Track dismantling approx. 300 m,
— Earthworks approx. 14 000 m³,
— Drainage (restricted by the rigol system) approx. 1 140 m,
— Track construction including protective layer approx. 950 m,
— Rail load-bearing plates with substructure approx. 61 units,
— Rails in rail load-bearing plates approx. 320 m,
— Track closure 1 piece,
— Civil engineering work for piping approx. 1 000 m³.
Title 2:
— Transhipment area, asphalt approx. 5 825 m².
Title 3:
— Single switch dismantling 1 piece,
— Dismantling DKW 1 unit,
— New switches 3 units,
— Ballast bed cleaning approx. 480 m,
— Change in superstructure materials W 49-4588-B 70 approx. 480 m,
— 1 piece of guarantee services.
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.