-
Published31/07/2024
-
Deadline29/08/2024
-
Opening of tenders29/08/2024
-
Awarded12/11/2024
-
Today04/12/2024
Utilities
- indicates text translated automatically in your browsing language
GAZ conversion car dealership to firefighting centre and new control centre _ Lot 23: Heating, plumbing, compressed air and refrigeration systems Text automatically translated in your browsing language Automatically translated
Lot 23: Heating, plumbing, compressed air and refrigeration systems The Burgenlandkreis intends to convert an object owned by it, including outdoor facilities, into a security centre for the Burgenlandkreis . This is to be carried out in two phases of construction. The first construction phase comprises the sub-objects Conversion of the former car dealership into a fire service centre as well as training areas and the new construction of the control centre. In the second construction phase, the construction of a cold / storage hall and the construction of the district training area within the outdoor area is planned. The property in question is located in the industrial area of the village of Wethau, which belongs to the city of Naumburg (Saale). The land is within the scope of development plan No . 3 of the municipality Wethau Gewerbepark I " Above the Rosental " on the B8 7/180. The area is located southwest of the city of Naumburg (Saale ) and borders directly on the federal road B 180. The total land area is approx. 9,225 m2. The property is currently built with a car dealership. The building was constructed in 1996/1997 as a new building . The conversion of the area into a fire-fighting centre and district training area requires numerous construction measures, both on the existing building and in the area of the open-air facilities. In addition, some functional areas will be built as new buildings. The present schedule of services includes the following services: - Work in and on the existing building (former car dealership), as well as in the new building of the control centre. - The scope of services includes heating, sanitary and cold water systems. - The entire central plant technology is housed in the new building of the control center. - In the FTZ is the domestic water connection for both objects and is supplemented by a central water treatment and pressure increase. - Interconnections between the buildings have already been implemented in the course of civil engineering work. For this purpose, printing and laying protocols are provided by the civil engineer. - Due to the temporal explosiveness of the object in its implementation, increased assembly personnel can be expected! The multiple approach to the construction site as well as construction time interruptions due to the execution in construction phases and the interlocking of services of different trades must be taken into account. Text automatically translated in your browsing language Automatically translated
Type: price
Description: 1
Weight (percentage, exact): 1
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.