-
Deadline09/12/2024
-
Published19/12/2024
-
Today22/06/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Smart Metering Rollout - Switching to digital, remotely readable electricity meters Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
DFS Deutsche Flugsicherung GmbH (DFS), headquartered in Langen, Hesse, is responsible for air traffic control in Germany. For this purpose, it operates a comprehensive infrastructure for positioning, navigation and radio as well as radar control centres and control towers at the airports and is a consumer of electricity at the corresponding locations. The power consumption of the DFS is distributed over about 350 acceptance points with RU counters. Of these, just over half of the meters at airports are located in 16 so-called closed distribution networks or customer facilities. The remaining meters outside the airports are distributed throughout Germany to a further 60 general supply networks. With the exception of the RLM meters, which are mandatory for acceptance points with consumption >100,000 kWh, the DFS meters are predominantly non-remotely readable, electronic, and sometimes even mechanical meters. In a first stage, DFS initially intends to convert the existing RU meters to digital, remotely readable electricity meters with registering load response measurement, so-called smart meters, at around 180 locations in the general supply networks. Through the self-initiated change from the basic metering station operator to a nationwide uniform competitive metering station operator, DFS wants to build up a uniform metering infrastructure, exploit the technological potential of digital meters and - in addition to performance, also control the timing of the changeover. The contractor (AN) is to carry out the metering point operation for electricity within the meaning of §3 MsbG for all locations listed in Annex 1 in the future and to carry out the conversion to smart meters (rollout) and also provide various measurement services. Text automatically translated in your browsing language Automatically translated
https://www.subreport.de/E25127184
https://www.subreport.de/E25127184
72314000 - Data collection and collation services
65320000 - Operation of electrical installations
65500000 - Meter reading service
38500000 - Checking and testing apparatus CVP code deduced from the text of the procedure AI-generated
50400000 - Repair and maintenance services of medical and precision equipment CVP code deduced from the text of the procedure AI-generated
50000000 - Repair and maintenance services CVP code deduced from the text of the procedure AI-generated
38000000 - Laboratory, optical and precision equipments (excl. glasses) CVP code deduced from the text of the procedure AI-generated
50411000 - Repair and maintenance services of measuring apparatus CVP code deduced from the text of the procedure AI-generated
38554000 - Electricity meters CVP code deduced from the text of the procedure AI-generated
38421000 - Flow-measuring equipment CVP code deduced from the text of the procedure AI-generated
38550000 - Meters CVP code deduced from the text of the procedure AI-generated
38420000 - Instruments for measuring flow, level and pressure of liquids and gases CVP code deduced from the text of the procedure AI-generated
Type: quality
Description: Die Zuschlagskriterien werden in den Vergabeunterlagen bekannt gegeben.
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.