-
Published22/09/2025
-
Deadline20/10/2025
-
Awarded16/03/2026
-
Today07/08/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Frankfurt(M) Hbf track 25, lot 1 switch heating station EWHA W7 + lot 2 platform lighting
As part of the project ‘Knoten Frankfurt Hauptbahnhof – Frankfurt Süd’, the Frankfurt Central Station is to be extended to include the railway track Track 25. The new building includes the main station and the associated apron and will be built on the north side of the station. The project includes the following implementation contents: Dismantling or adaptation of the existing platform roof of track 24 and the production of a new platform roof taking into account the existing structure, dismantling of the canopy after the disposal site, production of the new track Manufacture of a new middle platform between track 24 and track 25 taking into account the operational and structural constraints as well as the operational tasks, production of the design concerns below the new track in the postal parcel chamber and connected access tunnel taking into account the defined framework conditions (e.g. monument protection, parallel projects), track plan adaptations due to the platform width, new point connection with connection to the apron, adaptation of the technical track equipment (overhead line, control and security technology, telecommunications, EIO systems). The new construction of track 25 is part of an overall concept that aims to improve the performance of the Frankfurt node by eliminating crossroads and consequential conflicts as well as bottlenecks. One of these bottlenecks is the lack of sufficient platform capacity at rush hour at Frankfurt (M) Hbf station. The construction of a further track is intended to increase overall quality by increasing platform capacity, bundling local traffic on the north side of Frankfurt main station and the associated unbundling of traffic flows, increasing reliability, flexibility and thus availability of traffic in the context of subsequent projects. 1 or 2 lots can be offered.
https://bieterportal.noncd.db.de/evergabe.bieter/api/supplier/external/deeplink/subproject/6084fbee-4227-4491-9f81-335d5dca66b8
https://bieterportal.noncd.db.de/evergabe.bieter/api/supplier/external/deeplink/subproject/6084fbee-4227-4491-9f81-335d5dca66b8
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.