-
Published24/01/2025
-
Deadline28/02/2025
-
Opening of tenders28/02/2025
-
Today19/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Technical design services (development of technical and economic documentation phases DTAC, DTOE, PT and DDE, technical assistance from the designer) and execution of works within the project "Increasing energy efficiency of Sighetu Marmatiei Municipal Hospital, Str. Avram Iancu No 22’, an investment objective financed by the NRRP – the Renovation Wave, in accordance with the attached specifications. Text automatically translated in your browsing language Automatically translated
The purpose of the public procurement is to draw up a technical documentation in full accordance with the current situation of the objective and the legal regulations in force, drawn up on the basis of the Documentation approving the intervention works (DALI) made available by the Contracting Authority and the execution of the construction-installation works in order to achieve the investment objective of the project ‘Increasing the energy efficiency of the Sighetu Marmatiei Municipal Hospital, Str. Avram Iancu nr. 22’, investment objective financed by the National Recovery and Resilience Plan – Component 5 – Renovation Wave, Operation Moderate Energy Renovation of Public Buildings – Local Authorities, call NRRP/2022/C5/2/B2.1.a., in compliance with the legislation in force and EU regulations. The contract involves the following steps: 1. Technical design services (drawing up the technical and economic documentation for the DTAC phases, including studies on the biology of constructions, portions of biologically degraded elements will be included in the structural plans and sections, elaborated by the structural team, refurbishment of the technical expertise for the buildings C6, C12, C16 that will not include the consolidation of the casing, as well as the architectural - aesthetic treatment of these facilities in the energy rehabilitation project of the hospital pavilions, the actual installation of the facilities will be preceded by the architectural-structural rehabilitation of the historical pavilion (according to the recommendations of favorable opinions no. 150/M/09.10.2023-11.10.2023 and no. 77/M/12.06.2023-15.06.2023, issued by the Ministry of Culture), including obtaining the building permit, DTOE, PT and DDE), technical assistance services from the designer during the execution of the works. Through the Tenderer's care, the technical execution project, including the execution details, shall be verified by certified project verifier specialists on construction fields/sub-domains and specialties for installations, in order to verify the fulfillment of the basic requirements applicable to constructions. 2. Execution of works on the basis of the Technical Project verified and authorized according to the legal provisions. Number of days until which clarifications can be requested before the deadline for submission of tenders/candidates: 18. The deadline expressed in number of days for the CA to respond clearly and completely to all requests for clarifications is 12 days before the deadline set for the submission of tenders. Text automatically translated in your browsing language Automatically translated
https://www.e-licitatie.ro
https://www.e-licitatie.ro
71328000 - Verification of load-bearing structure design services
71356200 - Technical assistance services
71322000 - Engineering design services for the construction of civil engineering works
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.