Published11/07/2024
-
Deadline25/07/2024
-
Opening of tenders25/07/2024
-
Today28/04/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Electrical installation work Text automatically translated in your browsing language Automatically translated
Low-voltage systems: - Main distribution with measuring transformer system approx. 600A and approx. 15 sub-distributions - Approx. 90,000m low-voltage cables of different cross-sections including installation systems - Approx. 1400 indoor and outdoor luminaires - Safety lighting as a central battery system with substations Structured cabling - 10 network nodes in 19 data cabinets - Approx. 600m fiber optic cables and approx. - Modular ELA with approx. 20 lines and approx. 220 loudspeakers - Clock system with approx. 30 auxiliary clocks - Approx. 4 RWA compact control panels - Cable pull and clamping work for HLSK/MSR - Cable pull and clamping work for BMA - Bell/intercom system - Internal lightning and surge protection - Construction power supply Building lighting in the building Text automatically translated in your browsing language Automatically translated
https://www.meinauftrag.rib.de
https://www.meinauftrag.rib.de
45311200 - Electrical fitting work
45311000 - Electrical wiring and fitting work
45317000 - Other electrical installation work CVP code deduced from the text of the procedure AI-generated
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
Type: price
Description: Preis ist einziges Kriterium
Weight (percentage, exact): 100
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.