-
Published19/08/2024
-
Deadline18/09/2024
-
Today18/09/2026
Utilities
- indicates text translated automatically in your browsing language
Carcass II
approx. 830 m2 substructure for wall covering - approx. 481 m2 wall cladding "OP rooms" made of stainless steel, 1 mm with GK core 18 mm - approx. 144 m2 wall cladding "OP hallway" / "introduction" made of pre-coated steel, 1 mm galvanised - approx. 320 m2 plasterboard wall "OP sterile floor" / "hallway" - approx. 20 pcs. sliding door, 1 pcs., manually operated, A = 1300 mm or A = 1500 mm - approx. 298 m2 metal cassette ceiling incl. substructure manufactured with complete protection against dust penetration - approx. 6 pcs. ceiling system OP 2600m3/h or 3600m3/h - approx. 2 pcs. work table installation introduction - approx.
https://www.staatsanzeiger-eservices.de
https://www.staatsanzeiger-eservices.de
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.