-
Published19/12/2023
-
Deadline30/01/2024
-
Opening of tenders30/01/2024
-
Today28/09/2026
Utilities
- indicates text translated automatically in your browsing language
Tile work – construction of new multifunction house with fire brigade hall
New construction of a multifunctional house with fire brigade hall The Multifunctionshaus is fully subclad and has two levels (EG and OG), this part of the building is constructed in masonry with pre-stressed reinforced concrete ceilings. The multifunction house is followed by the fire brigade house to be constructed in steel construction. The building envelope (walls and ceilings) of the fire brigade house is to be covered with sandwich elements. Multifunctional house and fire brigade house have a flat sloping roof. Between the multifunctional house and the fire brigade house, a single-shot connecting structure in solid form, with a walkable flat roof. Dimensions of the various parts of the building: Multifunctional building approx. 17 m x 28 m intermediate structure approx. 5 m x 12 m fire brigade house approx. 28 m x 20 m
https://www.staatsanzeiger-esercies.de
https://www.staatsanzeiger-esercies.de
Type: price
Description:
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.