-
Awarded18/09/2024
-
Published22/10/2025
-
Deadline24/11/2025
-
Opening of tenders24/11/2025
-
Today10/05/2026
Utilities
- indicates text translated automatically in your browsing language
Granting a long-term loan in the amount of PLN 4 456 330
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
1. Name of the contract: ‘Long-term loan of PLN 4 456 330’. The subject of the contract is the granting of a long-term loan in the amount of PLN 4 456 330 intended to finance the planned deficit of the district budget in the amount of PLN 2 075 664 and repayment of previously incurred liabilities on loans and advances in the amount of PLN 2 380 666. 3.A detailed description of the subject of the contract is included in Annex 5 to the FTZ. 4.The Contracting Authority requires that the economic operator in the fleet of motor vehicles (within the meaning of Article 2(33) of the Road Traffic Act of 20 June 1997) used for the performance of a public task should have a sufficient number of electric vehicles or vehicles powered by natural gas, thus complying with the provisions of Article 68 para. 3 in connection with Art. 2 point 2 of the Act of 11 January 2018 on electromobility and alternative fuels, if the performance of the contract will require the use of motor vehicles. 5.The Employer does not provide for employment on an employment contract in accordance with the position of the Polish Financial Supervision Authority of 12 December 2012 (DPP/WOP1/023/663/2/2012/MS), the position of the UKNF of 16 September 2019 and the position of the Polish Bank Association presented on 23 December 2019 in the article of the BANK monthly on the preferred form of employment in banks 6. The Contracting Authority provides for the use of the procedure referred to in Article 139 sec. 1 of the PPL Act, i.e. The contracting authority will first examine and evaluate the tenders, and then make a qualitative selection of the Contractor whose tender was the highest rated, in terms of the absence of grounds for exclusion and compliance with the conditions for participation in the procedure. 7. The contracting authority will apply the procedure referred to in Art. 2 of the PPL Act, i.e. a ‘reverse procedure’ in which economic operators are not required to submit the declaration referred to in Article 125(1)(b) and (c) with the tender. 1 of the PPL Act (JEDZ-a). This declaration, at the request of the contracting authority, will be required to be submitted only by the contractor whose tender will be the highest rated. 8. The contracting authority provides for the award of contracts referred to in Art. 1 point 7) of the PPL Act. 9. The contracting authority requires that the contractor in the fleet of motor vehicles (within the meaning of Article 2(33) of the Road Traffic Act of 20 June 1997) used for the performance of a public task should have a sufficient number of electric vehicles or vehicles powered by natural gas, thus complying with the provisions of Article 68(1)(b) and (c) EUTMR. 3 in connection with Art. 2 point 2 of the Act of 11 January 2018 on electromobility and alternative fuels, if the performance of the contract will require the use of motor vehicles. 10. Loan period: from the date of signature of the loan agreement until 31.12.2040. 11. Duration of credit: from the date of signature of the loan agreement until 31.12.2025. The exact starting date of the loan tranche will be determined after the signature of the agreement.
https://platformazakupowa.pl/pn/powiat_zdunskowolski
https://platformazakupowa.pl/pn/powiat_zdunskowolski
Type: price
Description: Cena - 100%
Weight (percentage, exact): 100
Postal address:
Town: Warszawa
Postal code: 02-515
Country:
Official name: Bank Gospodarstwa Krajowego
Postal address:
Town: Warszawa
Postal code: 00-955
Country:
Official name: Bank Spółdzielczy w Poddębicach
Postal address:
Town: Poddębice
Postal code: 99-200
Country:
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.