-
Published21/10/2025
-
Today18/11/2025
-
Deadline19/11/2025
-
Opening of tenders19/11/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
CAPITALIZABLE REPAIRS MOTOPOMPULAR AND AGREGATE GROUPS OF CIMENTATION AND FISURATION Text automatically translated in your browsing language Automatically translated
The capitalizable repairs of the motopomp groups and the cementing aggregate aim to fully restore the technical parameters of the equipment to the level of the initial characteristics set out in the manufacturer's specifications, norms and standards in force. The ACF 500 cementing aggregate is used to perform various well operations (fluid circulation, pressure samples, cementation, hydraulic cracking, killing wells with eruptive manifestations, acidization, etc.). Motopompa groups, are used together with other machinery in various well operations, such as well deepening, drilling of new wells. Triplex pumps are defective and require replacement of components such as: replacement of crankshaft bearings, cross ends, hydraulic part, sealing system and plunger valves; it is also necessary to replace suction manifolds and discharge manifolds; capitalizable repair of Caterpillar engines, Allison transmissions; replacement of used hoses, replacement of used drive shafts, repair of used R80 reducers. It is necessary to repair the platform of the aggregate, the skids of the motopompa groups and an anti-corrosion protection of the machines. Any request for clarifications must be submitted to SEAP (http://sicap-prod.e-licitatie.ro/pub). The Contracting Entity shall respond in a clear and complete manner to all requests for clarification/additional information on the 11th day before the deadline set for the submission of tenders. The number of days until which clarifications can be requested before the deadline for submission of tenders / applications will be 18 days. At the same time, according to the legal provisions in force, any economic operator has the right to request clarifications on the content of the tender documentation and implicitly on the contractual clauses (which are part of the tender documentation) 18 days before the deadline for submission of tenders. The APRC for the award procedure will be filled in by the economic operators directly in SICAP. CAUTION: Failure to submit the EAD integrated into SEAP for the sole tenderer/associated tenderer/supporting third party/subcontractor together with the tender results in the rejection of the tender as unacceptable in accordance with Article 143(2)(b) of Government Decision No 394/2016 and its rejection in accordance with Article 143(1) of Government Decision No 394/2016. Text automatically translated in your browsing language Automatically translated
https://www.e-licitatie.ro
https://www.e-licitatie.ro
50530000 - Repair and maintenance services of machinery
45000000 - Construction work CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.