-
Published14/03/2015
-
Deadline28/04/2015
-
Opening of tenders28/04/2015
-
Today28/09/2026
Utilities
- indicates text translated automatically in your browsing language
Germany-Essen: Structural shell work
The city of Essen intends to build a new building as the second on the site of the former Sessenberg municipal building station, Iron Hand 41-45/Barbarakirchgang in 45139 Essen-Eastviertel. Extension of the main fire station of the professional fire brigade. 2 units of the voluntary fire brigade and areas of training and training of the professional fire brigade are to be accommodated here. In addition to the necessary office, training, stay and changing areas of approximately 1 000 m² of useful floor area, parking spaces for vehicles and containers with different requirements and a useful floor area of approximately 3.200 m² will be created.
Building construction:
Component A (2-floor, EC= vehicle hall; Og= training rooms):
Framework: Reinforced concrete posts, reinforcing pen walls and ceilings, reinforced concrete cores, roof structures partly as steel construction, interior walls EG/1.OG in part reinforced concrete walls, masonry walls/system partitions
Roof: Reinforced concrete flat roof with reinforced concrete formation, insulated, with waterproofing
Façade: Clinker overlays, metal windows and sectional gates in the area of façade openings
Component B/C (vehicle halls):
Framework: Reinforced concrete supports, reinforcing and load-bearing masonry walls and steel roof beams, reinforced concrete substrates as ring beams
Roof: Trapezoidal sheet flat roofing, insulated, with reinforced concrete amate formation seal
Façade: Clinker overlay, sectional gates in the area of façade openings
Building dimensions
Component A:
Length of component approx. 65.10 m
Width of the component approx. 21.0 m
Height of the component approx. 9.70 m (until OK Attica)
Height of the component approx. 12.60 m (up to OK technical enclosure)
Component B:
Length of component approx. 43.20 m
Width of the component approx. 12.60 m
Height of the component approx. 6.60 m (until OK Attica)
Component C:
Length of component approx. 43.20 m
Width of the component approx. 10.70 m
Height of the component approx. 6.60 m (until OK Attica)
Level heights
Component A
Ground floor approx. 4.80 m
1. Upper floor approx. 3.80 m
Component B/C:
Ground floor approx. 5.50 m (vehicle halls)
The tendered service includes the expanded carcass work.
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.