-
Published27/04/2013
-
Deadline17/06/2013
-
Awarded16/07/2013
-
Today31/08/2026
Utilities
- indicates text translated automatically in your browsing language
Poland-Bytom: Drilling and exploration work
‘Mining works at Zakład Central Zakład Oddradniania mine, Part I Restructuring of excavation works – main construction of items 321 m and item 630 m at the ‘Rail I’ shaft – ‘Siemianowice’ pump station and/or Part II Reconstruction of water pavements I and V items 270 m – ‘Jan Kanty’ pumping station and/or Part III Construction of a section from ventilation and pipe pavement to the ‘Witold II’ shaft on item 250 m – Stage IV with excavation and disposal of excavation and the purchase of 10 casing V-25/7 – ‘Jan Kanty’ pumping station and/or Part IV Reconstruction – reinforcement of the excavation works on the following items. 825 m – ‘Pstrowski’ pumping and/or Part V Enhanced water pavement housings I and II and water pavement sludge I – Pstrowski pumping and/or Part VI Reconstruction of the transport route – Pstrowski pumping station and/or Part VII Enhanced ventilation dip from item 650 m in item 500 m, together with the supply of materials – Powstańśl. Bytom I’ and/or Part VIII Reinforcement of waterway housing No 1 item 690 m – ‘Dębieńsko’ pumping station and/or Part IX Construction of a transport route in a compass from the main compass to the pavement I, together with the delivery of the EKO-15D wheel with equipment and signalling equipment – Yan Kanty pump station.
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.