-
Announced13/07/2013
-
Published14/09/2013
-
Deadline08/10/2013
-
Today15/08/2026
Utilities
- indicates text translated automatically in your browsing language
France-Hautmont: Construction work
The aim of the project is to rehabilitate and develop the ‘STPS’ brownfield:
— a dry covered port for small and large vessels of between 7 and 15 metres long, as well as all facilities for their maintenance (repair space, shoring area, etc.) and their resale, via a storage space identified and promoted, as well as a shipchandler,
a multimodal logistics hotel,
— a business reception area (other than logistics).
The project is being implemented on a brownfield industrial site with a land footprint of 72 000 square metres. The existing buildings are located in the corner of the Sambre and the European freight rail track (Creil-Jeumont line).
The surface area of all buildings is 24 000 square metres.
It has five halles without floor, joined, two ancillary buildings and a water castle on a substantially flat terrain.
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.