-
Published27/07/2026
-
Today08/08/2026
-
Deadline21/08/2026
Utilities
- indicates text translated automatically in your browsing language
Planning services LP 1-9 Renovation and automation Passenger Bridges Gates A, B and C
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
Flughafen Düsseldorf GmbH intends to renew and automate the passenger bridges at gates A, B and C. The aim of the measure is the planning of a total of 17 new passenger bridges (11 at gate A, 6 at gate C), the automation of 9 existing passenger bridges at gate B, the integration of a central control centre control system and the planning of the necessary infrastructure for PCA and 400 Hz systems. In addition, the transfer of a passenger bridge from position A01 to B11 shall be taken into account. The performance phase 1-9 is advertised.
https://www.subreport.de/E57563435
https://www.subreport.de/E57563435
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.