-
Published26/05/2025
-
Deadline23/06/2025
-
Today24/06/2025
Utilities
- indicates text translated automatically in your browsing language
Planning conversion ferry pier Nordermole Text automatically translated in your browsing language Automatically translated
The existing ferry piers are limited in their usability and durability. In particular, the wooden piles are damaged by the drill shells, which leads to a loss of material. Due to the state of damage, a new replacement must be built urgently. In addition to the structural problems, the existing rigid web construction cannot compensate for the different water levels in the trave. Thus, the constantly changing different freeboard heights of the jetty to the water surface must be compensated by ship's own disembarkation aids. This leads to restrictions of use up to the cessation of ferry operations at too high or too low water levels. Therefore, the new bridge construction is to be designed as a floating bridge system in order to always be able to guarantee the same access and exit qualities in the event of changing water levels. In addition, the current jetty is not suitable for use by larger ferries. The regular use of a double-end passenger ferry is currently not possible and so the intended turnaround time in the high season cannot be maintained. Text automatically translated in your browsing language Automatically translated
https://www.dtvp.de/Satellite/notice/CXP4YFY5S80
https://www.dtvp.de/Satellite/notice/CXP4YFY5S80
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.