Poland-Olsztyn: Engineering design services
1. The subject-matter of the contract is the drawing up of an investment programme and construction and implementation documentation, together with a cost-based part, for:
— task No 1 Orzysz – construction of 5 garage buildings for KTO Rosomak vehicles and accompanying infrastructure;
— task No 2 Orzysz – reconstruction of workshop building No 281 and accompanying infrastructure.
As part of the service, the investment programme must be carried out separately for each task and the design and costing documentation at the construction and implementation stage, together with the obtaining of a building permit decision separately for each task; the technical documentation must contain: updating of the site’s situational and altitude map for design purposes, a development project for a closed site with a ‘reserved’ clause, a land-use development project for an open site where necessary, a project for an inventory of green and tree stand management within the planned investment project (if necessary), guidelines for drawing up fire safety instructions for the facilities to be built, a design of the technological arrangement with equipment and catalogue cards, projects for the demolition of buildings and infrastructure that interfere with the location of the buildings under construction, projects for the organisation of traffic within the building to be constructed and reconstructed, guidelines for drawing up instructions for the use of equipment and equipment for which a manual is required, an inventory of the state of the existing site, connections and networks within the work to be carried out using for project purposes, balances of media needs using connection design, water law and decision to remove the rainwater of buildings and from the area of the planned investment where necessary, the energy performance of the facilities in accordance with the requirements of the Construction Law Act, geological surveys, together with geotechnical documentation on the installation of the facilities and the planned access sites and roads, using the use in the design, the technical specification for the execution and acceptance of works separately for individual sectors, information on safety and health protection in view of the specific nature of the construction work being carried out, which will form the basis for drawing up a safety and health plan, the decision to determine the location of the public-purpose investment project, and possibly a decision on the environmental conditions for the implementation of the public-purpose investment project, if necessary, the decision of the competent authority to cut trees in conflict with the planned investment, multi-industry construction project (excluding the teletechnical industry – alarm systems) with detailed solutions, construction design of the teletechnical sector – alarm systems with detailed solutions, pre-measurements, detailed investor cost estimates, ZKZ. The subject matter of the contract is described in detail in Annexes 2, 4, 5, 6, 7 to the ToR;
2. Place of performance of the subject-matter of the contract: Closed area of the Orzysz military complex. Area administered by 24 GGI Giżycko;
3. Warranty period: the Contractor’s liability for defects in the documentation shall cease to apply to the Contracting Authority on the date of completion of the construction and assembly works (technical acceptance of the works) subcontracted on the basis of the documentation;
4. Time limit required for the performance of the contract for Task 1 and Task 2 with a material effect: max 240 days, of which:
— investment programme – a minimum of 120 days from the date of signature of the contract, up to a maximum of 150 days from the date of signature of the contract,
— construction documentation – a minimum of 210 days from the date of signature of the contract, up to 240 days from the date of signature of the contract.
Official name: Rejonowy Zarząd Infrastruktury w Olsztynie
Postal address: ul. Saperska 1
Town: Olsztyn
NUTS code: PL622
Postal code: 10-073
Country: POL
Contact person: Sebastian Michalik
Main address: www.rziolsztyn.wp.mil.pl
Electronic via:
https://miniportal.uzp.gov.pl/
Postal address: ul. Hoża 51 lok. 18
Town: Warszawa
Postal code: 00-681
Country: POL
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.