-
Published13/06/2025
-
Today10/07/2025
-
Deadline18/07/2025
Utilities
- indicates text translated automatically in your browsing language
Restoration of canal and road body Ramersbacher Straße and Am Schwimmbad in Bad Neuenahr-Ahrweiler - Planning services Engineering structures, technical equipment and transport facilities acc. to HOAI Text automatically translated in your browsing language Automatically translated
The subject of the award is planning services for the property planning of engineering structures as well as a traffic facility in Ramersbacher Straße and the street Am Schwimmbad in Bad Neuenahr-Ahrweiler. The engineering structures include a rainwater and sewer network in the separation system, which is partly newly built and partly renovated. An additional component is a rainwater pretreatment plant as well as the excavation required for construction. In addition, specialist planning services are awarded for the technical equipment of the rainwater pretreatment plant as well as for the structural design of the Verbaus and special structures in the sewer network. In the street At the swimming pool, the transport system is to be planned with technical equipment. The interim periods of the framework schedule will become the contractual term. The execution period extends from 18.08.2025 to 01.06.2032 with completion of performance phase 9 after the end of the warranty period. Text automatically translated in your browsing language Automatically translated
https://plattform.aumass.de/Veroeffentlichung/av25a6a2-eu
https://plattform.aumass.de/Veroeffentlichung/av25a6a2-eu
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.