-
Announced16/01/2025
-
Published11/03/2025
-
Today15/03/2025
-
Deadline24/03/2025
-
Opening of tenders24/03/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Repair of the K-12 water heater at the Cieszyn CHP Plant Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
1. The detailed scope of the subject of the contract includes the following works and supplies related to the replacement of elements of the boiler pressure part: a) development of the technology for the execution of the works in question, including agreement and approval by the UDT, b) disassembly of ash removers in the water heater area, c) disassembly of a set of water heater coils, d) prefabrication, supply and installation of a set of coils I and II of the water heater with suspensions (the range of replacement of the superheater coils, from the inlet chamber nozzles to the outlet chamber nozzles), e) reconstruction of erosion overlays on the water heater coils, f) installation of all 6 ash removers within the water heater coils, in the event that it is not possible to use existing multi-nozzle pipes, delivery and installation of new ones. g) disassembly, delivery in the event that it is not possible to reuse and assembly of armor elements, thermal insulation, structural elements, harnessing, fittings and piping in the area where the coils of the water heater are introduced, in accordance with the technology adopted by the contractor for carrying out the works, h) dismantling the supply in the event of the inability to reuse and assemble the remaining boiler elements enabling the execution of the above-mentioned works according to the technology of carrying out the works adopted by the contractor, i) performing non-destructive assembly tests of the welded elements of the pressure part and boiler pipelines covering the scope of replacement according to the technical conditions of the UDT, j) performing pressure tests and participation in boiler tests by the UDT inspector during and after the assembly works, k) performing alkaline cooking of the boiler, taking into account the flow of alkaline mixtures by the water heater, including the development of process technology, agreeing the technology with the Contracting Authority, performing an auxiliary installation, carrying out the process, discharging and management of post-process sewage, dismantling of the auxiliary installation and restoration of the system, l) participation in the boiler start-up and trial traffic after the completion of the assembly works and acceptance by the UDT Text automatically translated in your browsing language Automatically translated
https://swoz.tauron.pl/
https://swoz.tauron.pl/
50531100 - Repair and maintenance services of boilers
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
45000000 - Construction work CVP code deduced from the text of the procedure AI-generated
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork CVP code deduced from the text of the procedure AI-generated
Type: price
Description: cena - 100%
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.