-
Announced29/08/2024
-
Estimated published16/12/2024
-
Today10/05/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Construction of a bridge at the Saverne pass on A4
The works consist of the construction of a 50m wide wildlife structure with a crossing length of 45m located on A4 at PR 434,800 in order to restore ecological continuity at the Saverne pass. This structure will be PRAD type with central battery or wood vault type without central battery. The rock walls on either side of the ecopont will be reinforced by mechanical nailing.
45221100 - Construction work for bridges
45233000 - Construction, foundation and surface works for highways, roads
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.