-
Published03/06/2025
-
Today22/06/2025
-
Deadline02/07/2025
-
Opening of tenders02/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Execution of construction and assembly works for the task: Reconstruction of the Starogard GPZ with lines WN 110kV and SN 15kV Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
1. The subject of the contract is the execution of construction and assembly works for the task: Reconstruction of the Starogard GPZ with lines WN 110kV and SN 15kV. 1.1. The scope of works includes: 1.1.1. dismantling of two columns of the 110 kV double-track overhead line between GPZ SwaroĆŒyn and GPZ Starogard, GPZ Skarszewy and GPZ Starogard Nos 223 and 224, 1.1.2. dismantling of one column of the 110 kV SE Pelplin single-track overhead line between GPZ Starogard and GPZ Starogard, stand No 36 1.1.3. (1) GPZ Skarszewy - GPZ Starogard on the section from SĆ. 223 to the gates of GPZ Starogard, (2) GPZ SwaroĆŒyn â GPZ Starogard on the section from SĆ. 223 to the goals of GPZ Starogard, (3) SE Pelplin - GPZ Starogard on the section from SĆ. 36 for gates of GPZ Starogard, with a total length of 0.195 km, 1.1.4. disassembly of SN 15 kV pins with a total length of 0.550 km, 1.1.5. disassembly of overhead switchgear WN 110kV in traditional technology, 1.1.6. disassembly of internal SN 15kV switchgear, 1.1.7. disassembly of overhead SN 30kV switchgear with capacitor battery, 1.1.8. disassembly of container 15kV switchgear, 1.1.9. disassembly of telecommunications container, 1.1.10. disassembly of telecommunications tower, 1.1.11. disassembly of station area lighting, 1.1.12. disassembly of control cable lines, 1.1.13. construction of one double-track column of overhead 110 kV line (cable type, pipe type), GPZ SwaroĆŒyn - GPZ Starogard, GPZ Skary - GPZ Starogard, stand No. 223, 1.1.14 construction of one single-track column on an overhead 110V cable type, cable, SE Pelplin - GPZ Starogard No. 36, 1.1.15. construction of 110 kV overhead lines (1) PGZ Skarszewy â PGZ Starogard on the section from SĆ. 222 to the letter. 223 (2) PGZ SwaroĆŒyn â PGZ Starogard on the section from 223 to the letter. 223, (3) SE Pelplin - GPZ Starogard on the section from SĆ. Thirty-five to the letter. 36, with a total length of 0.235 km, 1.1.16 construction of cable lines WN 110 kV relation: (1) GPZ Skarszewy - GPZ Starogard on the section from SĆ. 223 to the 110 kV switchgear, (2) GPZ SwaroĆŒyn â GPZ Starogard on the section from 223 to the 110 kV switchgear, (3) SE Pelplin - GPZ Starogard on the section from SĆ. 36 for 110 kV switchgear, with a total length of 0.196 km, 1.1.17 construction of a station building with 110/15 kV GPZ Starogard installations 1.1.18 construction of an internal 110 kV dual-system switchgear in GIS technology, 1.1.19 construction of an internal 15 kV three-section switchgear, 51-field switchgear in single-row construction, 1.1.20 construction in a new location of three WN/SN transformers with the power of: (4) two 25MVA (5) one 40MVA - existing transformers operating on Starogard GPZ, Note: replacement of the 110/30/15 kV No. 1 three-winding power transformer with a new 110/15 kV 25 MVA two-winding transformer is not included in the scope of the task. In the scope there is only the transfer of 3 transformers WN/SN. 1.1.21 construction of three earth-short-circuit compensation stations equipped with: (1) grounding transformer, (2) adjustable extinguishing choke, (3) forced primary resistor, 1.1.22. land development (including construction of a new layout of internal roads and sidewalks with a fence), 1.1.23. construction of a water supply connection with a sanitary and rainwater sewer connection, 1.1.24 construction of a technical protection system (SOT), 1.1.25 construction of a lightning protection and grounding installation, 1.1.26. construction of an outdoor lighting installation, 1.1.27. construction of control and signalling cables, 1.1.28 construction of a telecommunications tower, 1.1.29 construction of 22 MV cable outlets from the designed 15 kV switchgear to power the existing medium voltage network with accompanying infrastructure â 2.330 km. 2. The Contracting Authority, taking into account that the completion of the contract will take place after 01.01.2026, informs that it will reject the offer as inconsistent with the terms of the contract on the basis of art. 1 point 5 of the Public Procurement Act, which offered a switchgear for the primary distribution of SN using an insulating medium in the form of fluorinated greenhouse gases (including SF6), because on the day of acceptance of the construction work it will not be able to put such a device into use in accordance with Article 13 par. 9(a) of Regulation (EU) 2024/573 of the European Parliament and of the Council of 7 February 2024 on fluorinated greenhouse gases, amending Directive (EU) 2019/1937 and repealing Regulation (EU) No 517/2014 (https://eur-lex.europa.eu/eli/reg/2024/573/oj?locale=en). At the same time, the Contracting Authority informs that it will reject the tender as inconsistent with the terms of the contract pursuant to Art. 1 point 5 of the Public Procurement Act in the event of failure to indicate in the Offer Form the type of insulating medium in the scope of the switchgear of the primary type of SN. ATTENTION! In accordance with STWIORB, the Contracting Authority excludes the use of MV equipment in which an insulating medium in the form of fluorinated greenhouse gases (including SF6) is used. The Contracting Authority indicates that STWIORB's provisions in the above scope take precedence over the provisions concerning the use of the insulating medium specified in the Design Documentation and in the Technical Standards. 3. A detailed description of the subject of the contract is contained in the project documentation constituting Annex 12 to the SWZ and STWiORB constituting Annex 17 to the SWZ. The contracting authority requires that the subject-matter of the contract be performed in accordance with the guidelines indicated in these documents (Annex 15 to the RVU) and the instructions and standards annexed to the RVU (Annex 16 to the RVU) and the draft provisions of the contract (Annex 13 to the RVU). Text automatically translated in your browsing language Automatically translated
https://zakupy.energa-operator.pl/app/demand/notice/public/current/list?USER_MENU_HOVER=currentNoticeList
https://zakupy.energa-operator.pl/app/demand/notice/public/current/list?USER_MENU_HOVER=currentNoticeList
45220000 - Engineering works and construction works
71220000 - Architectural design services
71352000 - Subsurface surveying services
45317000 - Other electrical installation work
71300000 - Engineering services
71354000 - Map-making services
45311000 - Electrical wiring and fitting work
71350000 - Engineering-related scientific and technical services
45223000 - Structures construction work
45111000 - Demolition, site preparation and clearance work
71520000 - Construction supervision services
71541000 - Construction project management services
45500000 - Hire of construction and civil engineering machinery and equipment with operator
51000000 - Installation services (except software)
71000000 - Architectural, construction, engineering and inspection services
45112000 - Excavating and earthmoving work
71334000 - Mechanical and electrical engineering services
45440000 - Painting and glazing work
71340000 - Integrated engineering services
51900000 - Installation services of guidance and control systems
71510000 - Site-investigation services
45100000 - Site preparation work
45232000 - Ancillary works for pipelines and cables
45314000 - Installation of telecommunications equipment
45400000 - Building completion work
71330000 - Miscellaneous engineering services
45450000 - Other building completion work
45310000 - Electrical installation work
45442000 - Application work of protective coatings
71500000 - Construction-related services
71320000 - Engineering design services
51110000 - Installation services of electrical equipment
45110000 - Building demolition and wrecking work and earthmoving work
71521000 - Construction-site supervision services
45222000 - Construction work for engineering works except bridges, tunnels, shafts and subways
71540000 - Construction management services
45520000 - Hire of earthmoving equipment with operator
45330000 - Plumbing and sanitary works
51100000 - Installation services of electrical and mechanical equipment
45300000 - Building installation work
45510000 - Hire of cranes with operator
45233000 - Construction, foundation and surface works for highways, roads
45231000 - Construction work for pipelines, communication and power lines CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.