Publications Office of the EU
Provision of planning and construction services as a total contractor for the demolition and construction of four multi-family residential buildings with underground parking and outdoor facilities in Weilheim in Upper Bavaria (VOEK 426-25) - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates text translated automatically in your browsing language

Provision of planning and construction services as a total contractor for the demolition and construction of four multi-family residential buildings with underground parking and outdoor facilities in Weilheim in Upper Bavaria (VOEK 426-25) Text automatically translated in your browsing language Automatically translated

  • Published
    02/10/2025
  • Deadline
    12/11/2025
  • Today
    14/11/2025
Status
Submission closed
Type of contract
Works
Subject for Renewal
No
Buyer
Bundesanstalt für Immobilienaufgaben
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: DEA22 Bonn, Kreisfreie Stadt
Business sector (Main CPV)
45211300 Houses construction work
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
Not available
Tender reference number
VOEK 426-25
Description

With the housing offensive, the federal government, the federal states and the municipalities have set themselves the goal of countering the lack of affordable housing. The AG intends to demolish the existing development of four multi-family houses on parcels 2840/23 and 2840/40 Römerstraße / Steinlestraße in Weilheim in Upper Bavaria (Weilheim i.O.) and to realize the new construction of four multi-family houses with underground parking, whereby a modernization of the building stock and a moderate inner-local re-densification is sought. The planning agreed with the city of Weilheim envisages the construction of a total of 4 multi-family houses with 60 residential units and an underground car park. The required parking spaces are accommodated in a quarter underground garage. A development plan has already been drawn up for the construction project, which is currently under construction and is to be adopted in January 2026. This is to be understood as the basis for further planning. The implementation of the construction measures is to be carried out by a total subcontractor or transferee. As a federal agency, the AG is required to implement its construction projects as sustainably as possible in accordance with the climate targets of the Federal Government. The new residential buildings should therefore be able to be planned, built and operated as climate-neutrally as possible over the entire life cycle. The building materials should be used in such a way that their recycling is possible with minimal effort. Serial construction methods made of building materials that are as sustainable as possible are preferred. The construction of the new buildings can be carried out in both modular and conventional design. The BImA prefers a version in wood construction or with sustainable building materials. The preliminary planning study uses an axle dimension that allows flexible and functional floor plans as well as a variety of construction methods. The solid components of the new buildings are to be planned in such a way that they can also be prefabricated in series (e.g. stairwells, elevator shafts). The buildings to be planned must meet at least the requirements for the efficiency house 40, as well as the requirements for the ecological, socio-cultural and economic quality of buildings with the QNGplus seal. The roofs are to be equipped with photovoltaic systems. A tenant electricity model cannot be offered by the BImA. The electrical equipment of the apartments results from the currently valid DIN. A medium standard of equipment is to be planned. The planning must in principle follow the recommendations of the ‘Guide to Sustainable Building’ in the current version of the Federal Ministry of the Interior, Building and Home Affairs (BMI). Within BImA, the project is primarily subject to the portfolio management division during the planning and construction phase. With regard to the commissioning of the buildings and outdoor facilities as well as tenant matters, the residential sector is integrated. This is to be implemented in two construction phases. This call for tenders covers both construction phases. Text automatically translated in your browsing language Automatically translated

Submission Method
Electronic via:
https://www.evergabe-online.de/tenderdetails.html?id=805696
Tenders may be submitted
Electronic submission: required
https://www.evergabe-online.de/tenderdetails.html?id=805696
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
Not available
Award method
Criterion:
Type: price
Description: 50 %
Weight (percentage, exact):
Criterion:
Type: quality
Description: 50 %
Weight (percentage, exact):
Estimated value
Not available
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.