-
Published28/11/2012
-
Deadline27/12/2012
-
Today19/09/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
D-Landsberg: pipeline-design services
The Landsberg AöR waste water plant intends to build a pressure pipe from Landsberg to Halle-Nord, to which further areas will be connected. The implementation is planned to be carried out between 2013 and 2014 according to the investment plan.
The planning services, including the simulation of dirt loads and pressure shock calculation, are to be developed by mid-2013 for:
1. BA mixed water sewerage Landsberg transition to the Halle-Nord waste water treatment plant,
— approx. 18 100 m of ADL Landsberg to Halle, of which approx. 8 800 m DN 400 and approx. 9 300 m DN 450,
— Pumpwerk Landsberg,
— Conversion of the existing basins of Landsberg KA into rainwater overflow basins for mixed water treatment.
2. BA connection to the transition
— approx. 1 400 m ADL connecting district Hohenthurm to the ADL Landsberg to the Halle KA,
— Hohenthurm pumping station,
— Conversion of the existing basins of the Hohenthurm KA into rainwater overflow basins for mixed water treatment.
71322200 - Pipeline-design services
71327000 - Load-bearing structure design services
45200000 - Works for complete or part construction and civil engineering work
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.