-
Published04/07/2024
-
Deadline05/08/2024
-
Awarded31/10/2024
-
Today24/04/2025
Utilities
- indicates text translated automatically in your browsing language
Oberschule Werlte Rehabilitation BA 1 and BA 2 Property planning services Property planning services from work phase 5 to work phase 8 according to HOAI 2021 Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The Samtgemeinde Werlte is planning the renovation of the Albert-Trautmann-Schule construction phase 1 and construction phase 2. The first construction phase is the oldest part of the building (built in 1965). Essentially, the building envelope and the technology come from the year of construction. In addition, a flat roof was retrofitted (1989) on the buildings and a window renovation was carried out in 1986 and 2008. BA 1 is 2-storey and partial basement and includes the general classrooms, sanitary facilities and the associated adjoining rooms. The construction section 2 is almost identical, this is 2-storey, slightly smaller from the surface and is not basement. BA 1 has been built in a solid construction and the areas are GFA = 1,368.75m2 and NFA = 1,127.16m2, as the BRI = 5,558.18m3. BA 2 has been built in a solid construction and the areas are GFA = 1,148,562 and NFA = 999,12m2, as the BRI = 4,930,58m3. Creation of the second escape route via a steel staircase. (see fire protection concept) Demolition of the existing facade, installation of the necessary insulation (16cm) and the new clinker facade. Furthermore, the foundation for this work must be widened according to static evidence. The refurbishment concept (installation technology) of construction sections 1 and 2 includes the refurbishment of sanitary installations, the replacement of decentralised water heaters, the replacement of radiators, the closing of radiator niches, the refurbishment of electrical installations/lighting (LED) and the renewal of pipelines. A pollutant study was carried out for the buildings. The concept must be taken into account in the refurbishment planning and subsequent execution. A pollutant remediation is commissioned. The tables of the investigation are set out below. The entire pollutant concept is attached to the request. The Samtgemeinde Werlte takes over the planning services of the property planner (BA1 + BA2) up to LPH 4. The building application has already been submitted. The documents for the basic determination (energy expert opinion, pollutant expert opinion, inventory plans, etc.) will be made available for further work. The construction phases must be processed sequentially. The current school operation will continue, but the classes will be outsourced in the respective construction phase for the construction period. For the financing of the renovation of the buildings, a funding application will be submitted to KfW-Bank. Planning start is planned from the order. Construction is scheduled to begin in the summer of 2025. The net construction costs are assumed by the client as follows: KG 300: 1,712,924.40 € KG 400: €894,432.00 Text automatically translated in your browsing language Automatically translated
https://www.subreport.de/E53453645
https://www.subreport.de/E35717126
Type: price
Description: 35 %
Weight (percentage, exact):
Criterion:
Type: quality
Description: 15 % Sicherstellung der personellen Verfügbarkeit 50 % Methodik der Maßnahmendurchführung
Weight (percentage, exact):
Postal address:
Town: Oldenburg
Postal code: 26122
Country:
Official name: Architekten SEK Simon-Exner-Kersten GmbH & Co. KG
Postal address:
Town: Oldenburg
Postal code: 26122
Country:
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.